Construction method Product List and Ranking from 43 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  2. 東網工業 Niigata//Building materials, supplies and fixtures manufacturers
  3. 太洋基礎工業 Aichi//General contractors and subcontractors
  4. 4 桐井製作所 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Aug 27, 2025~Sep 23, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. SQ method 桐井製作所
  3. Crushed Stone Utilization Basket Method "Crushed Stone Box - saisekibako -" 東網工業
  4. 4 Coating material, coating agent "Friction Cutter" ASAHI KASEI ADVANCE CORPORATION 環境資材事業部
  5. 5 Construction method "Two-Line Welding Method (Two-Line Mesh Method)" ワイビーテクノ 東京事務所

Construction method Product List

421~435 item / All 576 items

Displayed results

Construction method "Obayashi-style steep slope roof and wall greening method"

It is a greening method that is less likely to cause soil erosion and can be applied to steep roofs and walls.

This construction method utilizes "E Soil," which is characterized by its fibrous shape, providing softness and excellent cushioning, as well as outstanding drainage capabilities for greening projects. The fibers of "E Soil" are intricately intertwined, making it resistant to soil erosion, a feature that enables greening from steep roofs to wall surfaces. Our technology has been recognized, and we are currently engaged in roof greening projects for domes and other structures as part of the national disaster recovery subsidy program. 【Features】 ■ Rich in cushioning due to its fibrous shape ■ Outstanding drainage capabilities ■ Resistant to soil erosion ■ Applicable to steep roofs and wall surfaces *For more details, please refer to the catalog or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Regitect RT Method"

Higashi, Chū, and Nishi Nihon Expressway Company has passed the "Durability Performance Test for Falling Debris Prevention"!

The "Regitect RT Method" is a concrete flaking prevention technique that exhibits remarkable substrate followability through a rapid-curing urethane membrane coating. Being a spray application method, it easily adapts to complex substrate shapes like I-beams and significantly shortens the construction period compared to conventional methods. Additionally, the main material, CV spray, cures within seconds when sprayed using a dedicated pressure pump, allowing for minimal weather impact and enabling work in low temperatures. 【Features】 ■ Excellent workability ■ Solvent-free resin ■ Stable coating properties ■ Superior coating performance *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "RT Wangard Clear Method"

The incredible performance achieved by the one-component high-strength urethane coating!

The "RT Wangard Clear Method" possesses various concrete protection capabilities such as salt resistance, carbonation prevention, and crack-following properties, and it is a method that complies with the "push-out test." Compared to conventional continuous fiber sheet methods, it allows for a reduction in construction time. By simply applying it, both "concrete protection" and "spalling prevention" can be achieved, making it effective for complex shapes like I-beams. 【Features】 ■ Visualization of deterioration conditions ■ Significant reduction in construction time ■ Excellent performance in concrete protection *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Kawano Industrial Co., Ltd. Product and Construction Method Catalog

Introducing various products and methods that provide the creation of a comfortable living environment!

This catalog is a product and construction method catalog from Kawano Industrial Co., Ltd., a comprehensive manufacturer of concrete products. It includes various products and methods aimed at the effective use of bamboo harvested through bamboo grove maintenance, starting with the "Bamboo Concrete Fish Reef," as well as high-strength, high-performance precast floor slabs "HC Floor Slabs," and the "PCa Outframe Method," which enhances seismic resistance and design, improving the safety of buildings. [Contents] ■ Bamboo Concrete Fish Reef ■ Bamboo Concrete Algae Fish Reef ■ HC Floor Slabs ■ HC Covers for Firewater Tanks ■ PCa Outframe Method *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method
  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco base (Eco cute tank unit, foundation exclusively for electric water heater installation)

Significant reduction in construction period and specialized in seismic performance!!

"Eco Base" is a concrete foundation specifically designed for the installation of eco-cute tank units and electric water heaters, developed in collaboration with Chubu Electric Power Co., Inc. It is completed simply by combining concrete blocks and tightening them with bolts, allowing for a significant reduction in construction time compared to traditional on-site methods. An aluminum rail is embedded in the top surface of the blocks, enabling the fixation of anchor bolts for almost all eco-cute tank units, regardless of manufacturer or model. 【Features】 ■ Achieves excellent seismic resistance (proven through seismic strength tests at Tohoku University’s Faculty of Engineering) ■ Can fix anchor bolts for almost all tank units without regard to manufacturer or model. ■ No formwork required, significantly shortening construction time!! ■ Contributes to environmental issues by not generating formwork waste. ■ Can be constructed regardless of season or weather, as it only requires assembling blocks. *For more details, please download the PDF catalog or feel free to contact us.

  • Earthquake-resistant construction method
  • Residential foundations
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "W2R Method"

We will achieve a drainage ditch renovation that excels in walkability and durability!

The "W2R method" is a drainage channel renovation technique that has very little impact on existing sidewalks, private land, and surrounding residents, making it very environmentally friendly. After cutting with the W2R cutter, the installation of the Pca cover allows for excellent workability and the possibility of shortening the construction period. Additionally, this method can cut from the inside without damaging the drainage channel, improving the three major issues of conventional methods. 【Features】 ■ Excellent workability ■ Very gentle on the surrounding environment ■ The W2R cutter can cut from the inner surface of the drainage channel ■ Excellent drainage capability ■ Excellent drivability *For more details, please contact us.

  • Gutters and U-shaped gutters
  • Renovation and repair methods
  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Soil Pressure Support Method "Multi Board (Retaining Wall) Method"

We will support the soil pressure on the PCa version using commonly available piles!

The "Multi-board (Retaining Wall) Method" is composed of piles and PCa panels (precast panels), and it is a method designed to support the earth pressure acting on the PCa panels with the piles. The standard spacing for pile installation is 4 meters, and to transfer the earth pressure from the PCa panels to the piles, the PCa panels are fixed to the front face of the piles using connecting fittings. This allows for a retaining structure that does not expose the piles, resulting in an aesthetically pleasing appearance. 【Effects】 ■ By combining H-shaped steel as the parent pile with PCa panels, the structure does not require a base slab, which reduces the excavation width, making it possible to construct in sites where securing excavation width is difficult. ■ Since a base slab is not required, this structure reduces the number of pile foundations, the amount of foundation concrete, and the volume of excavation, enabling cost reduction and shortening of construction time. *For more details, please download the PDF or feel free to contact us.

  • Special Construction Method
  • Concrete Retaining Wall

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

SSP construction method

Improving the seismic performance of pile bent piers! It is economically advantageous as large-scale temporary structures are not required.

The "SSP Method" is a reinforcement technique that can improve the seismic performance of pile bent bridge piers under strict constraints, such as directly beneath existing structures, without the need for large-scale temporary facilities, and without significantly altering the landscape or the river's cross-sectional area. By wrapping reinforcement steel plates around existing piles and driving them in, and integrating them with the existing piles using underwater non-separating non-shrink mortar, the seismic performance is enhanced. 【Features】 - Safe construction while maintaining the use of the existing bridge - No need for large-scale temporary facilities (temporary closures, temporary piers) - Excellent cost-effectiveness - Minimal impact on the river's cross-sectional area during and after construction - Can minimize the impact on navigation routes and rivers *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Propulsion from any direction! Pneumatic propulsion device "Grundrum"

This is an introduction to the efficient, lightweight, and compact "Grundram" method.

The Grundram is a pneumatic propulsion device that uses compressed air from a standard compressor. Using the power of compressed air, the internal piston of the Grundram strikes the main head, transmitting the impact force through the ram cone to steel pipes and other materials, making it suitable for various applications. 【Construction Method & Overview】 ■ Grundram Installation Pipe Propulsion Method - A method that joins the installation pipe to the existing pipe after drilling the existing pipe. - Highly adaptable to soil conditions. - Capable of propulsion in gravel and cobblestone mixed soil. - Chemical injection can be performed to the limit. - No need for support walls or reaction anchors. - The propeller is lightweight and compact. - Requires a small working space. ■ Grundram Steel Pipe Piling Method - A method that drives steel pipe piles into the ground using the impact force of the Grundram. - Allows for steel pipe work in low and narrow spaces, such as basements. - Equipment is extremely lightweight and compact. - Can be used in gravel and cobblestone mixed soil, with a wide range of applicable soil types. *For more details, please refer to the PDF or feel free to contact us.

  • Other fittings
  • Work tools
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Pneumatic propulsion device "Grundram mounted pipe propulsion method"

Indeed, progress! Here is an introduction to the "Grundram Installation Pipe Pushing Method."

The "Grun Drum Installation Pipe Pushing Method" involves using a Grun Drum to push a steel pipe sleeve from the planned installation position of a sewage manhole towards an existing pipe. After the pushing is completed, the soil inside the pipe is removed, and the existing pipe is drilled before joining the installation pipe to the existing pipe. The Grun Drum has a simple structure, making operation and maintenance inspections extremely easy. 【Features】 ■ High adaptability to soil conditions ■ Capable of pushing through gravel and cobble mixed soil ■ Can perform extreme chemical injection ■ No need for support walls or reaction anchors ■ The pusher is lightweight and compact ■ Requires a small working space *For more details, please refer to the PDF or feel free to contact us.

  • Other fittings
  • Work tools
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Air pressure propulsion system "Grundram steel pipe pile driving method"

Even in narrow spaces, the striking power remains the same! Introducing the 'Grundram Steel Pipe Pile Driving Method.'

The "Ground Drum Steel Pipe Pile Driving Method" involves setting the ground drum above steel pipe sheet piles and using the impact force of the ground drum to drive steel pipe piles and steel pipe sheet piles into the ground. The ground drum has a simple structure, making operation and maintenance extremely easy. 【Features】 ■ Enables steel pipe work in low and narrow spaces such as basements ■ Equipment is extremely lightweight and compact ■ Can be used for construction in gravelly soil, with a wide range of applicable soil types *For more details, please refer to the PDF or feel free to contact us.

  • Other fittings
  • Work tools
  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Introduction to the "Road Sludge Substrate Spraying Work" materials.

Effective utilization of recycled sludge generated from road maintenance!

This document contains information about the "Road Sludge Substrate Spraying Work" by Ishida Kanematsu Hakkou Construction Co., Ltd., which handles public works, private construction, civil engineering, building construction, as well as maintenance, snow removal, and greening projects. [Contents] ■ Road Cut Slope Greening ■ Road Surface Cleaning Sludge / Sewer Cleaning Sludge ■ Sludge Recycling and Dewatering Facilities ■ Finished Road Sludge Products ■ Vegetation Substrate Materials *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

CSM method

Deep depth and thick walls that accommodate various designs! Compact construction required for urban civil engineering.

The "CSM method" is a construction technique that uses a horizontal multi-axis rotating cutter to mix soil and a cement-based slurry in place, creating rectangular soil-cement walls (such as retaining walls and waterproof walls) and ground improvement structures. It leverages the performance of the horizontal multi-axis rotating cutter, which has a proven track record in the excavation of stabilized liquid for underground continuous walls, providing high excavation capability that allows for construction even in hard ground without auxiliary methods. Additionally, it can be constructed with uniform wall thickness, offering flexibility in setting the spacing of the necessary inserted core materials to respond to generated stresses. 【Features】 ■ High excavation performance and precision ■ Efficient construction management system ■ Low noise and vibration ■ Customizable core material spacing ■ Compact machinery capable of deep construction *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Solarara Signboard Light "SSL-280W"

Possible for about 9 days without sunlight (10 hours of use per day)! Sign light with built-in over-discharge prevention circuit.

The "SSL-280W" is a solar-powered sign light that is environmentally friendly. It can be used as a light source during emergencies such as power outages, taking advantage of its features for blow sign stands, iron frame signs, and lighting at construction sites with solar charging. Thanks to the rubber processing of the special mounting brackets, it is less likely to scratch signs and other surfaces, and the two-tier lens-equipped reflector brightens the entire area. 【Features】 ■ Operates for approximately 9 days without sunlight (10 hours of use per day) ■ Drip-proof structure ■ Built-in over-discharge prevention circuit ■ Automatic blinking device for nighttime ■ Can be installed on blow signs and iron frame signs *For more details, please refer to the PDF document or feel free to contact us.

  • Garden lighting/lights (LED/solar)
  • Solar Goods Solar Lighting
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Infrared construction light "Solara Nagare SS-S113RG"

This is a stream product that has upgraded the "Sorara Construction" used at construction sites across Japan.

The "Soraura Nagare SS-S113RG-B" is a construction light equipped with an infrared transmission and reception module. This product can be displayed in a stream (lit) in the direction of vehicle travel to guide them. The blinking of the stream allows drivers, pedestrians, and vehicles to easily recognize road boundaries and construction areas, making it easier to ensure safety. 【Features】 ■ Usable in tunnels (can be used during non-sunny hours) ■ Usable for both uphill and downhill lanes ■ Equipped with an infrared transmission and reception module ■ New type of battery case adopted ■ Drip-proof structure *For more details, please refer to the PDF document or feel free to contact us.

  • Garden lighting/lights (LED/solar)
  • Safety and consumables

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration