Construction Method Product List and Ranking from 353 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

Construction Method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. 水研 Shiga//Building materials, supplies and fixtures manufacturers
  2. 東網工業 Niigata//Building materials, supplies and fixtures manufacturers
  3. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  4. 4 桐井製作所 Tokyo//Building materials, supplies and fixtures manufacturers
  5. 5 ASAHI KASEI ADVANCE CORPORATION 環境資材事業部 Tokyo//Building materials, supplies and fixtures manufacturers

Construction Method Product ranking

Last Updated: Aggregation Period:Oct 15, 2025~Nov 11, 2025
This ranking is based on the number of page views on our site.

  1. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  2. SQ method 桐井製作所
  3. Crushed Stone Utilization Basket Method "Crushed Stone Box - saisekibako -" 東網工業
  4. 4 Coating material, coating agent "Friction Cutter" ASAHI KASEI ADVANCE CORPORATION 環境資材事業部
  5. 5 50mm Dedicated Continuous Water Valve 'Sgate MN (Mini)' 水研

Construction Method Product List

511~525 item / All 575 items

Displayed results

Shot Blast "L Type"

Ideal for processing large items! By using a wide-angle projection device, it can be utilized more effectively.

We would like to introduce our shot blast "L type." The table blaster is designed to place items on a table and rotate them while projecting abrasive materials, making it suitable for processing large items. By using a wide-angle projection device (WR type), uneven grinding can be eliminated, allowing for more effective use. *For more details, please refer to the PDF materials or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shot Blast "Type B"

The processed item is rolled, and the grinding material is projected by the rotor to perform grinding! Complete discharge of the processed item is carried out.

We would like to introduce our shot blast machine, model 'B'. This device rolls the workpieces inside a polygonal barrel and projects abrasive material using a rotor for grinding. After completion, the barrel is inverted to fully discharge the workpieces. *For more details, please refer to the PDF document or feel free to contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Specialized in anti-corrosion processing (also confident in painting)

Currently offering a variety of rust prevention treatments (shot blasting, steel shot, etc.).

Multi-functional rust prevention processing (shot blasting, steel shot) and layering are well-regarded. 【Features】 Long-lasting rust prevention performance, heat resistance, chemical resistance, and durability of the coating Quick removal of rust and old paint, resulting in a clean surface that can be reused Compatible with thin plates Blast processing possible in the state of fabricated products Large item processing also available with extensive equipment and a 10-ton crane TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Iron Works Hiroshima Official Link

  • Rust Inhibitor

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Processing - Finishing Process Edition

Finishing processing is a method of machining to match the dimensional accuracy specified in design drawings, product specifications, and part specifications.

There are various types of processing. This time, I would like to explain finishing processes. For more details, please refer to the PDF download below. For anything related to blasting and painting, please leave it to us. Harada Ironworks Co., Ltd. TEL: 082-232-2445 FAX: 082-293-0286 Contact: Tao Mobile: 090-3742-9768 Email: bousei@harada-tekkou.co.jp Harada Ironworks Hiroshima Official Link

  • Bridge Materials
  • Tunnel Materials
  • River construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Harada Ironworks Hiroshima Official Website Completed

The homepage has been fully launched. We will update it regularly, so please take a look!!!

Our website, which conveys our technology to many customers, has finally been fully launched. We are sharing a wealth of information, including product information and technical details, etc. We will continue to update it daily, so please take a look. You can view it through the link below.

  • Rust Inhibitor
  • Special Construction Method
  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Impact on the durability of the coating / Preparation of the substrate is necessary.

Proper adjustment of the substrate is essential for maintaining the durability and lifespan of the paint.

The lifespan of metal coatings is generally considered to be around 10 to 30 years. The factors that influence this lifespan can be broadly categorized into the following four: Surface Preparation: Proper adjustment of the metal surface before painting is crucial. Cleaning and treating the surface improves the adhesion and durability of the coating. Number of Coats: It is also important to adhere to the appropriate number of coats. Ensuring sufficient coating thickness enhances the corrosion resistance of the metal. Type of Paint: The type of paint used significantly affects the lifespan. It is necessary to select appropriate paint that matches the metal's usage environment, considering factors like weather resistance and chemical resistance. Painting Techniques, Climate, and Surrounding Environment: The skills used in the painting process and the construction environment are also important factors. By employing appropriate painting techniques and considering climate conditions and the surrounding environment, the quality and lifespan of the coating can be improved. By properly managing these elements, the lifespan and corrosion resistance of metal coatings can be maximized. For more details, please refer to the PDF below. Harada Ironworks Hiroshima Official Link

  • Rust Inhibitor
  • Special Construction Method
  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Primer required, prevents peeling.

If you apply topcoat paint without a primer, it will peel off. Compared to products that have both primer and topcoat, those without primer have weaker adhesion to the substrate, making the paint film more prone to peeling.

When comparing products that only have a topcoat without a primer to standard painting products that include a primer, it was found that the products without a primer easily had their paint film peel off. Primer paint has the dual effect of preventing rust and strongly adhering to the substrate and base material, so it cannot be omitted. Although the primer is not visible, it plays an important role in maintaining corrosion resistance. Additionally, if the primer is not applied properly, the topcoat may be applied unevenly or show inconsistencies, resulting in an unattractive finish. Furthermore, the primer enhances the permeability of the paint, allowing the topcoat to adhere better, which can improve the durability and anti-corrosive properties of the paint film. In other words, the primer is a crucial step that significantly affects not only the appearance but also the performance and lifespan of the paint. Therefore, omitting the primer greatly increases the likelihood of having a paint job that peels easily or products that are prone to rust, making it essential to always apply an appropriate primer.

  • Rust Inhibitor
  • Special Construction Method
  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The relationship between blasting and painting.

In painting, proper surface preparation (substrate treatment) is essential to achieve a good finish. The most effective method for surface preparation is blast treatment.

"Surface preparation" refers to the process of preparing the underlying material or substrate. Metals are melted, cooled, and solidified during the manufacturing process, but when exposed to high temperatures, they combine with oxygen in the atmosphere to form a film known as an oxide layer. If painting is done without removing this oxide layer and impurities, contaminants will mix between the paint and the substrate, leading to poor adhesion. Additionally, the functionality of the paint will not be realized due to the influence of impurities, preventing it from performing as intended. However, by using blasting to prepare the substrate, the surface oxide layer, rust, and other contaminants can be completely removed. Furthermore, by using angular abrasives, countless fine irregularities are created on the substrate, increasing the surface area for paint adhesion and preventing peeling. By cleaning and preparing the substrate with blasting before painting, the lifespan of the paint film can be extended two to three times, providing long-term economic benefits.

  • Rust Inhibitor
  • Special Construction Method
  • paint

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shortening construction periods and reducing costs: TNF method

"Shallow improvement" that supports the entire ground surface of the building without using piles.

The "TNF Method" is a low-cost special foundation construction method that integrates the slab and building foundation with improved ground using solidifying materials, supporting the building across the entire improved ground surface without the use of piles. By dispersing soil stress in multiple directions, it suppresses one-directional extrusion of the soil. It allows for construction while protecting historical heritage and other underground assets. Additionally, it significantly reduces the use of materials such as rebar, concrete, and formwork. 【Features】 ■ Suppresses differential settlement ■ No uplift steps that occur in pile-supported buildings ■ The improved ground shields against surface outflow of soil and mitigates liquefaction directly beneath the building ■ Minimal impact on underground natural environments such as groundwater ■ Protects underground buried objects ■ Reduces CO2 emissions *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

TNF-D Method

Contributing to the overall shortening of the construction period! Compared to typical foundation shapes, the ground improvement reduces the contact pressure.

The "TNF-D method" disperses the stress under the foundation by shaping the foundation into a trapezoidal form. It reduces stress on the underlying ground and supports the foundation with a strong TNF improved ground. By minimizing the foundation volume, it can reduce the amount of concrete, excavation, and rebar used. Additionally, it contributes to reducing environmental impact through labor-saving construction. 【Features】 ■ Reduction of foundation structure costs ■ Shortening of foundation structure construction time ■ Resolution of labor shortages ■ Reduction of environmental impact *For more details, please refer to the PDF materials or feel free to contact us.

  • Ground foundation construction method
  • Ground improvement

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Construction Case】Accessory Work Well Point

A method used when it is expected that drainage by well pumps alone will be difficult!

The "Well Point Method" involves attaching well points to the ends of pipes, injecting jet water, and driving numerous pipes into the ground around the excavation site. This method uses vacuum power to draw groundwater from the installed pipes, thereby lowering the groundwater level. It is a type of well method used when it is anticipated that drainage by well pumps alone will be difficult. It is widely used for underground pipe installation work, septic tank burial work, ground liquefaction countermeasures, and improvement methods for weak ground. This is a ground improvement work used when conducting excavation work in areas with spring water. 【Features】 - Used when it is anticipated that drainage by well pumps alone will be difficult. - Widely used as an improvement method for underground pipe installation work and septic tank burial work. - Used when conducting excavation work in areas with spring water. *For more details, please refer to the related link page or feel free to contact us.

  • Ground improvement
  • Drainage and water removal
  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Crushed Stone Utilization Basket Method "Crushed Stone Box - saisekibako -"

The "labor-saving cage method" allows for easy and speedy construction using crushed stone as backfill material. [Crushed stone can be used]

We respond to the voices from the field saying, 'There are no large stones used in gabion work' and 'It is difficult to manually arrange and align large stones.' ■ Features of the 'Crushed Stone Box - saisekibako -' - The fine mesh of the wire netting on the front and side allows for filling with crushed stone of 20mm or larger (No. 4 or larger). - By filling with crushed stone, the middle filling work becomes significantly faster compared to traditional gabion methods. - Since the top cover (top panel) is generally not used, there is less work involved in attaching coils. (Note: The top panel is optional.) - The assembly of the panels is simple, allowing anyone to assemble them smoothly. - The main body of the gabion is made of galvanized aluminum alloy welded wire mesh, providing a sturdy structure. - Using galvanized aluminum alloy wire makes it highly corrosion-resistant. (Material durability: approximately 30 years underwater, 30 to 150 years in the atmosphere) - Compared to Quick Gabions (panel-type mattress gabions) and Quick Gabions for fine gravel (double mattress gabions), the direct construction costs are lower. (Comparison with in-house products) We also undertake construction work. Please feel free to consult with us.

  • Baskets and futon baskets
  • Slope protection material
  • Embankment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Timber for civil engineering and construction: sheet piles, batten corners, wooden scaffolding boards.

For temporary construction wood, go to Nissei Mokuzai!

Our company provides construction and building timber tailored to the diverse needs of construction sites, along with a logistics system that enables rapid response. We offer a wide range of temporary timber for civil engineering and construction, including batten corners, sheet piles, wooden scaffolding boards, piles, and plywood, as well as various building materials. We handle not only stock items but also custom orders and non-standard products, processing and assembling them for delivery from Shin-Kiba in Koto Ward to the site! Additionally, we are an authorized dealer of Kaneka products. We handle insulation materials such as Kanelight foam, as well as raised materials and solar panels. Moreover, our logistics system allows for same-day and next-day delivery to the southern Kanto region. Please consult us for deliveries to other regions.

  • Formwork material

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Manufacturing services for steel structures and machinery.

Equipped with advanced processing facilities and equipment, we will respond to various requests!

Our company provides manufacturing services for steel structures and machinery. We respond to our customers' requests and offer a comprehensive service from design to production, installation, and trial operation. We are committed to high quality and high performance, utilizing our technical expertise to achieve excellent work, which has allowed us to accumulate numerous achievements over the years. Please feel free to contact us with any inquiries. 【Our Strengths】 ■ Advanced equipment ■ High-level technology ■ Integrated system from processing to on-site installation *For more details, please feel free to contact us.

  • Steel structure construction
  • Woodworking machines, instruments, and tools
  • Steel Structure System

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Exterior construction work

Keep the area around the building clean and functional! We carry out asphalt paving and interlocking work.

Aqua Co., Ltd. conducts exterior construction work. By performing exterior construction around buildings, the surrounding space can become more usable and aesthetically pleasing. It is also possible to reassess features that have not been used for many years or are not being utilized effectively, creating new spaces or renovating existing ones. Please feel free to consult us about any concerns regarding the area around your building. 【Features】 ■ Asphalt Paving Work - Paving with asphalt after removing roads within the property and flower beds. - Installation of flat parking lots and road repair work is also carried out. ■ Interlocking Work - Construction that involves paving with stones or blocks. - We also adjust any lifting or defects in existing interlocking pavements. *For more details, please refer to the related links or feel free to contact us.

  • Pavement construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration