Ground-mounted PV rack (for solar panels) Solar Terrace 2
By setting up pre-assembled aluminum support legs on pile-driven columns, installation labor can be significantly reduced. This is ideal for medium to mega projects.
Kuri Energy has a production capacity for mounting structures equivalent to 160 MW (160,000 kW) of solar power generation equipment at its own production facility. With a majority market share in its headquarters in Australia and numerous achievements in the European and American markets, it already has a proven track record of combinations with many panel manufacturers' systems. Thanks to the latest production equipment, the production lead time is approximately three weeks for the 5 MW class, allowing for short delivery times.
- Company:シー・エス・シー 本社、大阪支店、福岡出張所
- Price:Other