Next Generation Scaffolding 'Iq SYSTEM Work Procedure Manual'
We are publishing the work procedures for the next-generation scaffolding with a height of 1,900 mm that creates a wide space.
The "Iq SYSTEM Work Procedure Manual" introduces the work procedures for the wedge-type scaffolding Iq system with a flange connection method. It covers "preparatory work and material delivery," including confirmation of the construction plan related to scaffolding, conducting safety meetings, and inspecting machinery and tools, as well as "important points regarding scaffolding inspections," such as monitoring the assembly of scaffolding and pre-work inspections. It also includes "assembly procedures," such as the placement of jack bases and the installation of support columns. [Work Procedures] ■ Preparatory work and material delivery ■ Important points regarding scaffolding inspections ■ Assembly standards ■ Assembly procedures ■ Dismantling procedures For more details, please contact us or download the catalog.
- 企業:光洋機械産業 本社 営業企画部
- 価格:Other