[Case Study] Office of a Certain Company
We can accommodate short construction periods by assembling panels at the factory! Here are examples of the "NSSF method."
We would like to introduce a case study of our construction methods for office and company housing. This is a three-story building with a construction area of 579.63 m², proposed for customers looking for dormitories, company housing, and offices. We handle everything from design to construction in-house, allowing for short construction periods. We have received feedback from customers stating, "Since we standardly use external insulation, we can maintain a uniform temperature, allowing us to work in a comfortable environment." 【Case Overview】 ■ Background: We want to carry out construction that can be completed in a short time. ■ Points - Proposal born from a unified system: Realizing our strength of one-stop service. - Unique solutions from Kakefu Juken: Capable of construction in a short time. - A system that achieves efficiency: By assembling floor and wall panels in the factory, we realize labor-saving on-site. *For more details, please refer to the PDF document or feel free to contact us.
- Company:カケフ住建 本社・本社工場
- Price:Other