Attention facility managers of school air conditioning systems. The "Reflex," compliant with the Ministry of Land, Infrastructure, Transport and Tourism's piping guidelines, is being increasingly adopted in public schools!
The installation of air conditioning systems in public elementary and junior high schools has become an urgent issue, and the government has announced the installation of air conditioning systems in all (public) elementary and junior high schools. The costs have been included in the government budget.
Due to the low height and long horizontal layout of school buildings, expansion joints are often installed. This is because dividing the structure can minimize the damage the building receives from external forces such as earthquakes.
The piping guidelines in the Ministry of Land, Infrastructure, Transport and Tourism's "Standard Specifications for Public Building Construction" mandate the use of flexible joints for piping that passes through expansion joints. As a result, the demand for Reflex, which complies with these piping guidelines and ensures the proper use of joints, has surged, and it is being increasingly adopted in public schools. [Please see our delivery records.] Additionally, Reflex is typically in stock, allowing for quick responses to urgent construction needs.
*For more details about the product, please refer to the PDF materials or feel free to contact us.