[Construction Example] Elementary School / Ibaraki Prefecture
Using the Tech One series! Introduction of a case study for constructing an elementary school with a span of less than 8 meters.
Here is an introduction to a case study of an elementary school constructed in Ibaraki Prefecture. Using the Tech One series, it was completed in 2015. The total floor area is 9,145.55 m², and the span is less than 8 m. You can view the detailed information about the case from the related links, so please take a look. 【Case Overview】 ■ Span: Less than 8 m ■ Fire resistance: None ■ Year of completion: 2015 ■ Location: Ibaraki Prefecture ■ Total floor area: 9,145.55 m² ■ Materials used: Tech One series *For more details, please refer to the PDF document or feel free to contact us.
- Company:タツミ
- Price:Other