[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility
The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies from vehicle maintenance facilities.
This is an introduction to a case study implemented at a vehicle maintenance facility. The work inside the vehicle maintenance facility was conducted without air conditioning, but due to the increasingly severe heat during summer years, we were considering measures against heatstroke. As a solution, we installed one integrated spot bazooka in the vehicle maintenance lane, which is the main work flow, and two additional integrated spot bazookas on the opposite side. We considered various products, but after experiencing the actual machine at an exhibition, we decided on the spot bazooka from Ease. The deciding factor was its high air volume, which allowed the air conditioning's cooling breeze to reach far away. After installation, the dehumidified dry air reached us, drying our sweat and creating a comfortable environment. [Implementation Overview] ■ Installation Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Integrated Spot Bazookas ■ Installation Date: July 2020 *For more details, please refer to the PDF document or feel free to contact us.
- Company:イーズ 本社
- Price:Other