Snow melting pipe block
Revamping the image of snow-melting pipes! Shorter road occupancy period for early reopening of traffic!
The snow-melting pipe block can be easily installed by simply connecting 5.5m blocks together. Compared to on-site construction, it allows for a shorter road occupation period, enabling early traffic reopening. 【Features】 ■ Can be used as a boundary line ■ Shortened construction period ■ Labor-saving ■ Small-scale traffic regulation ■ Compatible with curves, high functionality, and high workability ■ Adaptable to on-site conditions *For more details, please download the catalog or contact us.
- Company:ミヤシゲ 環境営業所
- Price:Other