Slabs Product List and Ranking from 12 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

Slabs Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

  1. 日本カイザー Tokyo//Other construction industries
  2. 伊藤忠丸紅住商テクノスチール 東京本社 Tokyo//Building materials, supplies and fixtures manufacturers
  3. 富士ピー・エス 関西支店 Osaka//Other construction industries
  4. 4 アイ・エル・シー Fukuoka//Building materials, supplies and fixtures manufacturers
  5. 5 昭和コンクリート工業 Gifu//Other construction industries

Slabs Product ranking

Last Updated: Aggregation Period:Oct 08, 2025~Nov 04, 2025
This ranking is based on the number of page views on our site.

  1. Kaiser Railway Viaduct Slab 日本カイザー
  2. High-Quality Bed Board System "Super KH Slab System" 伊藤忠丸紅住商テクノスチール 東京本社
  3. Hollow Slab "I.L.C. Void" アイ・エル・シー
  4. 4 Shortened construction period! Direct ceiling finishing is possible! 'FR Board Slab Method' 富士ピー・エス 関西支店
  5. 5 LS slab (prestressed FRC slab) インフラテック

Slabs Product List

16~18 item / All 18 items

Displayed results

Kaiser Railway Viaduct Slab

Strongly, quickly. It enables construction directly above live wires.

The "Kaiser Railway Elevated Bridge Slab" is a rational slab that uses high-quality precast components manufactured in a factory, enabling the construction of elevated bridges that excel in durability and cost-effectiveness. Compared to conventional cast-in-place slabs, it does not require formwork or shoring, which reduces construction noise and minimizes material yard requirements, contributing to shorter construction timelines and lower total costs. Please feel free to contact us if you have any inquiries. 【Features】 ■ Shortened construction timeline ■ Possible to construct directly above live lines without shoring ■ Reduced life cycle costs ■ Existing slab designs can be applied directly ■ High safety standards ■ Uniform quality ■ Improved quality of structures *For more details, please download the PDF or feel free to contact us.

  • IPROS23831025298041875791.jpeg
  • Bridge Materials

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Slab for Kaiser Railway Viaduct Compatible with cast-in-place beams

It is possible to carry out construction directly above live wires, and it is compatible with cast-in-place beams.

The "Kaiser Railway Elevated Bridge Slab" is a rational slab that uses high-quality precast (PCa) components manufactured in a factory, allowing for the construction of elevated bridges that excel in durability and cost-effectiveness, and is installed on cast-in-place beams. Since the lower half of the slab cross-section is made of PCa, it can be constructed directly above live lines. Additionally, by casting the upper half of the slab on-site, the structure becomes integrated. The intermediate and cantilever sections are unified, eliminating the need for formwork and shoring. Compared to conventional cast-in-place slabs, it reduces construction noise and material yard requirements, contributing to shortened construction schedules and reduced total costs. Please feel free to contact us if you have any inquiries. 【Features】 ■ Shortened construction schedule ■ Possible to construct directly above live lines without shoring ■ Reduced life cycle costs ■ Existing slab designs can be directly applied ■ High safety ■ Uniform quality ■ Improved quality of structures

  • 23-02.JPG
  • 23-03.JPG
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Shortened construction period! Direct ceiling finishing is possible! 'FR Board Slab Method'

The small beams can be omitted, allowing for flexible planning! By not using wooden formwork, we contribute to the Earth's environment!

We would like to introduce the "FR Slab Construction Method." The FR slab is a ribbed precast concrete slab, and the prestressing is introduced through PC steel materials arranged in the rib sections. The "FR Slab Construction Method" involves laying this FR slab on beam formwork, placing the upper reinforcement, and then pouring on-site concrete to integrate the components. 【Features】 ■ The underside of the FR slab is flat, allowing for direct ceiling finishing. ■ Small beams can be omitted, enabling flexible planning. ■ Long-term deflection due to creep is minimal. ■ By adopting the FRS method, it can accommodate floor level differences in areas such as water facilities. *For more details, please refer to the PDF materials or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration