[Underfloor Heating Installation Example] Fukushima Prefecture - Construction procedure after marking out every 1 shaku.
We have laid down a sheet in the living room and dining room.
1. We will address the steps and unevenness of the underfloor plywood and mark every 1 shaku (30 mm) to drill holes for dropping the wiring of the sheet under the floor. 2. We will lay out the sheets, drop the wiring under the floor, and seal it with waterproof tape. 3. We will connect the wiring of the sheet and the secondary side of the controller under the floor. *For more details, please download the PDF or feel free to contact us.
- Company:エム・ティ・ケイ
- Price:Other