A shield room has been installed at a certain university in the Chubu region for use in classes and research. To prevent noise interference with inspection equipment, it was constructed as a "fully independent" structure by obtaining clearance from LGS and separating it from the walls. 【Installation Location】A certain university in the Chubu region 【Dimensions】W 3,050 × D 2,350 × H 2,500 【Purpose】For inspections using medical devices 【Performance】Shielding performance: attenuation of over 40dB from 500kHz to 500MHz Soundproofing performance: attenuation of over 30dB at 500Hz 【Additional Equipment】Medical soundproof shield door (single opening) 【Construction Period】Approximately 1 week