Renovation(1) - List of Manufacturers, Suppliers, Companies and Products | IPROS

Last Updated: Aggregation Period:Apr 08, 2026~May 05, 2026
This ranking is based on the number of page views on our site.

Renovation Product List

1~9 item / All 9 items

Displayed results

Exterior wall repair and renovation tiles "Repair Tiles" *For large-scale renovations of condominiums.

Color and texture, with astonishing reproduction ability for the repair, restoration, and reconstruction of exterior wall tiles! High-quality repair tiles available for order from just one piece with a short delivery time.

Tile Lab's "Repair Tile" is a printed fired tile designed for the repair, renovation, and restoration of exterior wall tiles in condominiums, facilities, and general residences. It has a wealth of adoption records, particularly in large-scale renovation projects for condominium exteriors. By managing colors digitally and using inorganic pigments to fire the surface of ceramic tiles at 800 degrees, it achieves a quality equivalent to traditional tiles. The digitization of sample production allows for "numerical management" of color expression, enabling "short delivery times" for the repair tiles. 【Features】 ■ Realizes speedy delivery times through digital color management ■ Stable reproduction of desired colors with a wide range of color reproduction digitally ■ Can be produced from a single piece, allowing for cost-effective offerings *For more details, please refer to the PDF materials or feel free to contact us.

  • tile
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Renovation of the exterior wall of the Calligraphy Hall

If you need to make a decision regarding repairs or renovations, please contact Baijido, which uses environmentally friendly paint. Estimates are free.

Our company is committed to using environmentally friendly paints that are gentle on the Earth. In this regard, we also use paints that meet our unique selection criteria.

  • Other construction services
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

<Sato Industrial's Commitment> Floor Renovation

We support direct installation and replacement with reduced construction time and costs! The rise of the finished surface is 8mm.

We offer "floor renovation" services that keep construction time and costs down. We grind the existing flooring or remove carpets and vinyl sheets, and then directly install new flooring on top. Our UV fine ceramic coating finish is designed for foot traffic and boasts excellent abrasion resistance. 【Features】 ■ Direct installation of flooring ■ Construction time as short as 1 day per classroom ■ The rise of the finished surface is 8mm ■ Foot traffic compatible with excellent abrasion resistance from UV fine ceramic coating *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation and repair methods
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Insulated Window Renovation "RAKUE"

Easily enhance everyone's life through the window.

This is a cover method product that allows for the replacement of new windows while keeping the existing window frames. Unlike conventional cover methods (which use screws and hardware for fixation), this method uses specially developed polyurethane for fixation, preventing heat loss from the gaps between the existing sash frame and the new sash frame. Additionally, the adhesive strength is approximately ten times greater than that of traditional methods. This method can be used to replace any type of existing sash, regardless of its type, material, shape, or the type of structure. The newly installed windows use high-performance K-WINDOW, which improves insulation and creates a more comfortable window area after replacement.

  • Window and shutter openings
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Case Study] Nippon Express Co., Ltd. <Hazardous Materials GDP Compliance/Warehouse Renovation>

In response to the increasing demand for pharmaceutical storage, the hazardous materials warehouse is being renovated from "room temperature" to "temperature-controlled"!

We would like to introduce a case study of problem-solving at the Osaka branch of Nippon Express, which operates a transportation business. The most important aspect of operating a temperature-controlled hazardous materials warehouse is the "setting of temperature conditions." This is because the temperature conditions significantly affect the floor plan, structure, and equipment. The company set the temperature conditions to "1°C to 30°C," allowing for a range of management temperatures. As a result, they were able to exclude the installation of anterooms and winter heating equipment from the initial discussions, thereby establishing a foundation for the plan. 【Case Overview】 ■ Challenge: Compliance with GDP for hazardous materials / Renovation of hazardous materials warehouse ■ Solution: Setting of temperature conditions / Forecasting changes in available space ■ Industry: Logistics ■ Warehouse Type: Temperature-controlled hazardous materials warehouse ■ Stored Items: Pharmaceuticals *For more details, please download the PDF or feel free to contact us.

  • Logistics and warehouse management systems
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Drainage pump unit SFA pump × factory and warehouse renovation

When you can't achieve the drainage slope in factory or warehouse water renovations, the "SFA pump" provides an immediate solution!

The "SFA Pump" is a drainage pump unit originating from France, with a history of 65 years and over 10 million units installed worldwide. We offer a lineup that includes the compact drainage pump unit for general wastewater, "Sanispeed Plus," and the large-capacity drainage pump unit for general wastewater and sewage, "Sanicubic 2 Classic." There is no need for construction work to lay drainage pipes through floor chipping or to create sewage pits. In addition to installation examples at certain factories in Saitama Prefecture and Gunma Prefecture, there are numerous adoption records in various factories. 【Installation Examples】 ■ Certain factory in Saitama Prefecture: Sanicubic 2 Classic ■ Certain factory in Gunma Prefecture: Sanicubic 2 Classic ■ Renovation work at a certain warehouse in Tokyo: Sanicubic 2 Classic ■ Addition of handwashing facilities at a certain warehouse in Tokyo: Sanispeed Plus/Sanicubic *For more details, please refer to the PDF materials or feel free to contact us.

  • pump
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Large-scale renovation: Hinai Shape Park Skateboard Park

Over 20 years since its opening! The major park filled with repairs is undergoing a huge transformation!

The "Kainigata Park Skateboard Park" located in Kyoto City, Kyoto Prefecture, was established over 20 years ago. It features a main park with a bank surface and a quarter pipe, covering approximately 1000m2. It is a well-known park with a long history in Japan. However, due to its location next to a riverbed, the ground has been prone to movement, resulting in a surface that was heavily damaged and in need of repairs. Despite this, many people continue to come and skate, and it is loved by enthusiasts from all over the country. For the existing repair areas, special repair materials were used, and a large American-made grinding machine was employed to grind down the rough concrete surface. The quarter pipe and bank surface were hand-ground using a handheld grinder. A smooth surface was created, and further improvements were made with a penetrating surface hardener "Seal Hard" and a water absorption inhibitor "Aqua Pel Plus" to enhance wear resistance and rainwater durability. Finally, a test run was conducted on the skateboard to ensure proper grip. The surface not only returned to a smooth finish but was also completed as a long-lasting surface with wear resistance and rainwater durability! The Kyoto City Skateboard Association expressed their excitement, saying, "This surface is amazing!" Many skaters came during the opening, and we received numerous voices of joy!

  • トップ?.png
  • トップ?.png
  • トップ?.png
  • トップ?.png
  • Sports related facilities
  • Special Construction Method
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Renovation without excavation! Ditch repair construction system "Neplus Method"

The construction period is as short as one day! Since only the damaged parts are replaced, construction waste is reduced by 80%! Construction costs can also be significantly reduced.

The "Neplus Method" is a revolutionary drainage repair technique that only replaces the damaged upper part of the drainage channel. Since the lower part can be used as is, it reduces construction waste by 80% compared to conventional methods. For construction lengths of 8 to 10 meters, the work can be completed in as little as one day! By reducing the number of work processes, significant cost savings on construction expenses are achieved. 【Features】 ■ Use of undamaged lower parts, reducing construction waste by 80% ■ No excavation required, no excess soil disposal! ■ Cutting from the inside of the drainage channel, no impact on nearby structures ■ No need for temporary drainage channels, reducing expenses ■ NETIS registration: HR-060021 *For more details, please download the catalog or contact us.

  • Gutters and U-shaped gutters
  • Renovation

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration