[Example] Installation work for fourth-class reference points for land surveying.
Achieved approximately one-third time reduction compared to conventional methods! Utilizing network-based RTK!
We would like to introduce a case where M.T.Y Synthetic Co., Ltd. utilized a network-type RTK for "the installation work of Class IV reference points for land surveying." The site was for the installation of Class IV reference points for land surveying. It was a flat area on elevated ground, and there were no issues with satellite conditions or mobile phone communication. A total of 6 points were installed, achieving good results with an accuracy of within 1 cm. The operation went smoothly without any issues, and the work was completed in one day. 【Benefits and Effects】 ■ Achieved approximately one-third time reduction compared to conventional methods ■ Cost reduction ■ Shortened delivery times ■ The reduction in on-site work time has allowed us to take on more jobs than before *For more details, please refer to the PDF document or feel free to contact us.
- Company:ジェノバ
- Price:Other