Milling Mall Method: Gas Construction Case Studies
We have published a case study of gas construction using the milling mall method implemented by our company!
The underground obstacle response type mud-based thrusting method "Milling Mole Method," equipped with four special functions: exploration, improvement, cutting, and guidance, consists of three devices: a tunneling machine, a special telescopic pipe, and a special injection pipe, allowing for the precise cutting and removal of underground obstacles. This document includes case studies of gas construction using the Milling Mole Method. It features photos of underground obstacles cut on-site, along with comments from the site personnel. [Featured Cases] ■ New tunnel construction for the 2-1 Otemachi District plan in Chiyoda Ward, Tokyo ■ Installation of the Ise Bay crossing gas pipeline in Yokkaichi City, Mie Prefecture (gas conduit construction) ■ Main construction for the MAKP750A in North Shinagawa, Shinagawa Ward, Tokyo (Sankyo Bridge Phase III construction) *For more details, please refer to the PDF document or feel free to contact us.
- 企業:ヤスダエンジニアリング
- 価格:Other