Materials×寿エンジニアリング - List of Manufacturers, Suppliers, Companies and Products

Materials Product List

1~4 item / All 4 items

Displayed results

Easy temporary road material "Pura Road"

Consideration for the environment! Reduction of CO2 emissions by decreasing the use of heavy machinery during construction.

"Plaroad" is a simple temporary road material that can contribute to various environmental measures from many perspectives. Through initiatives for "carbon offset," it is possible to expect effects such as enhancing corporate image, promoting contributions to the environment, differentiating from competitors, and providing environmental added value to business partners. Compared to conventional construction methods, it can reduce CO2 emissions during transportation and construction by 5,416.6 kg, keeping it to just 7.4%. 【Features】 ■ Curing Performance: High water permeability exhibits excellent curing performance ■ Stability: Reliable stability with a staggered arrangement structure ■ High Strength: Capable of supporting large dump trucks and 50t rough terrain cranes ■ Versatility: Wide-ranging versatility from material storage areas to the foundation of temporary toilets ■ Workability: Lightweight and simple structure allows for easy manual installation *For more details, please refer to the PDF document or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Improved transportation efficiency with Plaroad! Temporary road materials that lead to cost reduction.

Increase transportation efficiency and reduce costs! One vehicle can construct approximately 260m² of temporary road.

"Plaroad" can be transported using a large unic crane (15t unic truck) with a capacity of 16 pallets. When not in use, its compact form allows for the transportation of approximately 250m2 of temporary road using one 10t truck (typically stacked in two layers at a height of 0.29m). Since it can be reduced to one-third in volume and one-twenty-fifth in area, transportation costs and vehicle arrangements can be significantly reduced. 【Features】 ■ Compact form when not in use ■ One 10t truck can transport about 250m2 of temporary road ■ Full size: 50 sheets per pallet ■ Half size: 100 sheets per pallet ■ Spacer: 200 sheets per pallet *For more details, please refer to the PDF materials or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

【Plaroad】Lightweight and easy to transport and install! Simple temporary road materials.

No need for joints or connection fittings! Manual installation is possible, reducing the construction period by 60%.

"Plaroad" is lightweight, making transportation, installation, and removal easy, and since it is made of plastic, it can be installed even in rainy weather. No joints or connection fittings are required, allowing for manual installation and reducing construction time by 60%. When not in use, its volume is reduced to 1/3 and its area to 1/25, enabling rapid installation of 50 to 60 m² per person per day. Please feel free to contact us when you need our services. 【Features】 ■ Weight is approximately 6.5 kg per sheet ■ Easy transportation, installation, and removal ■ Made of plastic ■ Installation possible even in rainy weather ■ Simple installation by just stacking *For more details, please refer to the PDF document or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Installation and removal of the 【Pura Road】 is easy! High-strength temporary road materials.

The allowable load for long-term loading is 40 kN/m² or less! Introducing materials for a simple temporary road that can support T-25 traffic.

"Plaroad" eliminates the need for joints and connection fittings, allowing for manual installation and reducing construction time by 60%. It is lightweight, making transportation, installation, and removal easy. Being made of plastic, it can also be installed in rainy weather. When not in use, its volume is reduced to one-third and its area to one-twenty-fifth, enabling rapid installation of 50 to 60 m² per person per day. 【Features】 ■ Passable for T-25 ■ Allowable stress of 90 kN/m² (the allowable load for long-term loading in material storage areas is below 40 kN/m²) ■ Weight is approximately 6.5 kg per sheet ■ Easy transportation, installation, and removal ■ Made of plastic *For more details, please refer to the PDF document or feel free to contact us.

  • Road construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration