[Case Study] Reliable FRP Waterproofing Construction and Reduced Work Time
Successfully shortened construction time! Introduced Iwata Drain "F-1" for FRP waterproofing work.
At Iwata Co., Ltd., we proposed the Iwata Drain "F-1" to Mr. S, who is installing FRP waterproofing, as part of our efforts to shorten work time and carry out the work efficiently without any leaks. The bonding surface with the waterproof layer is pre-roughened, eliminating the need for additional processing, and the connection and installation with the pipe are simple. This allows for easy and reliable waterproofing work, resulting in a reduction in construction time. 【Background of Introduction】 - Installation of FRP waterproofing in built-for-sale houses - Handling multiple sites at once - Need for efficient construction - Request: Shortening work time without causing leaks *For more details, please refer to the catalog or feel free to contact us.
- Company:イワタ
- Price:Other