[Case Study of Introducing a Decompression Dehydration Drying Device] Metal Material Processing Industry, Company A
Achieving zero emissions through significant cost reduction! Introducing a case study that successfully achieved over 90% volume reduction!
We would like to introduce a case study of Company A, a metal materials processing business located in Shizuoka Prefecture, which has implemented a "decompression dehydration drying device." The company had been outsourcing the treatment of 20,000 liters per day of water-soluble rolling oil wastewater, which resulted in significant disposal costs. However, with the introduction of the device, they successfully achieved over 90% volume reduction. Furthermore, the residual oil content has a low moisture rate and is of high quality, allowing it to be collected as a valuable material, leading to the achievement of zero emissions and significant cost savings. 【Case Overview】 ■Customer Name: Company A ■Location: Shizuoka Prefecture ■Industry: Metal Materials Processing ■Model Introduced: G 1000 ■Introduction Date: March 2012 ■Waste Liquid Treated: Water-soluble Rolling Oil Wastewater ■Treatment Volume: 20,000 L/day (operating 24 hours/day) *For more details, please refer to the PDF document or feel free to contact us.
- Company:東栄産業
- Price:Other