Case: Restoration of building foundations after an earthquake.
Each cylinder is mounted on a steel stool connected to the building's foundation!
After a devastating earthquake, 2,800 tons of buildings in the city center fell from their foundations, requiring them to be lifted up to 300mm and leveled. Using the EVO synchronized lifting system, we managed the lifting force and extension of 22 high-tonnage double-acting CLRG series hydraulic cylinders, safely and accurately lifting the foundation and buildings to the required positions. Draw wire stroke sensors were installed at each lifting position, providing displacement information to maintain synchronization accuracy across all positions to less than 1mm. By managing lift operations from a single central control system, safety and operational productivity were improved. 【Case Summary】 ■ Customer: Sync Lift Systems Ltd. (Christchurch, New Zealand) ■ Product: EVO Synchronized Lifting System, CLRG Cylinders *For more details, please refer to the PDF document or feel free to contact us.
- Company:エナパック 本社 営業部
- Price:Other