Construction method Product List and Ranking from 1592 Manufacturers, Suppliers and Companies

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

Construction method Manufacturer, Suppliers and Company Rankings

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

  1. Taiyo Kisokogyo Co.,Ltd. Aichi//General contractors and subcontractors
  2. 中外商工 Osaka//Building materials, supplies and fixtures manufacturers
  3. 成瀬化学 Mie//Building materials, supplies and fixtures manufacturers
  4. 4 水研 Shiga//Building materials, supplies and fixtures manufacturers
  5. 5 シーカ・ジャパン Tokyo//Building materials, supplies and fixtures manufacturers

Construction method Product ranking

Last Updated: Aggregation Period:Dec 24, 2025~Jan 20, 2026
This ranking is based on the number of page views on our site.

  1. Waterproof layer renovation method for achieving the long lifespan of facilities! Narlite injection method. 成瀬化学
  2. Lining Method for Sewer Facilities "Plascoat E/L" 中外商工
  3. Install the valve without stopping the water! 'EM Continuous Water Valve Method' 水研
  4. 4 側溝修繕工法『ネプラス工法』<施工前後の写真付き資料進呈> ネプラス工法全国会 本部
  5. 5 Foundation Omega Method HOKOKU ENGINEERING CO.,LTD.

Construction method Product List

3856~3870 item / All 4265 items

Displayed results

Pressure Adjustment Injection Method 'SAPIS'

A new technology that revolutionizes concrete crack repair!

Our company offers the pressure-controlled injection method "SAPIS," which demonstrates excellent injection technology, adaptability, and economic efficiency. You can choose from two types of injection machines: the "Vacuum Suction Type Pressure-Controlled Injection Method (TH-110002-A)" and the "Nozzle Type Pressure-Controlled Injection Method (TH-110003-A)." Please feel free to contact us if you have any inquiries. 【Features】 ■ High-quality repair technology ■ Wide range of adaptability ■ Environmentally conscious *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Example] Maruyama Zoo Repair Work [Water Jet Method]

Introduction of a case where asbestos was removed from an animal shelter using water jet technology in Sapporo, Hokkaido.

We would like to introduce a case study of our "Water Jet Method." At Maruyama Zoo in Sapporo City, Hokkaido, we used the water jet method to remove asbestos from the animal enclosure. This method is suitable for asbestos removal work as it does not generate dust. 【Case Overview】 ■ Location: Sapporo City, Hokkaido ■ Implementation Period: September 2019 ■ Type of Work: Asbestos removal in the animal enclosure ■ Method: Water Jet Method *For more details, please refer to the PDF document or feel free to contact us.

  • Special Construction Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Clean Nail® Method

I want to return clean water for the future of the Earth.

The "Clean Narl® Method" is a cleaning technique for floors that takes into consideration the natural environment. It is a newly developed technology aimed at cleaning floor surfaces without damaging the materials and regardless of the type of dirt. By adopting this method, significant reductions in work time and overall costs can be achieved. Additionally, it provides not only cleaning effects but also anti-slip effects. Please feel free to contact us if you have any inquiries. 【Features】 ■ Uses a uniquely developed powerful cleaning solution and dedicated neutralizing solution ■ Neutralization treatment can be performed on-site, allowing for direct drainage into the gutter ■ Capable of removing stubborn dirt as well as rust stains from floors ■ Provides anti-slip effects after application ■ Used waste materials can be disposed of as general waste, etc. *For more details, please download the PDF or contact us.

  • Special Construction Method
  • cleaning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "NS Cutting Method"

It is a cutting technology for installing seismic-resistant joints.

Our company provides a seismic-resistant flexible joint (secondary product) that can be installed at the connection points between existing pipes, rehabilitated pipes (composite pipes), and manholes without excavation. This method, called 'NS Cutting Method,' is designed to accommodate the extraction, protrusion, and bending of existing and rehabilitated pipes (composite pipes) under the assumption of Level 2 seismic motion. It can be executed regardless of the construction procedures before and after pipe rehabilitation. Additionally, the operation can be performed remotely via a control panel installed on the ground, ensuring safety and smooth execution. 【Construction Steps】 1. Preliminary Confirmation (Investigation Work) 2. Invert Breaking 3. Cutter Blade Replacement 4. Cutting Work 5. Installation of Seismic-Resistant Flexible Joint 6. Finishing Work *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Seismic reinforcement method "Remake Ring"

Seismic reinforcement method for rehabilitation pipes and manhole connections using non-excavation techniques!

Our company provides a seismic retrofitting method called "Remake Ring," which involves installing flexible seismic joints at the connection points between the non-excavated rehabilitated pipes (independent pipes) and manholes. This method is designed to accommodate the extraction, protrusion, and bending of rehabilitated pipes under Level 2 seismic motion. This method can be applied in two scenarios: one where flexible seismic joints are installed at locations where pipe rehabilitation has already been completed, and another where flexible seismic joints are installed alongside the pipe rehabilitation work. Please feel free to contact us if you have any inquiries. 【Application Scope】 ■ Applicable existing pipe types: Reinforced concrete pipes, ceramic pipes ■ Applicable rehabilitated pipes: Independent pipes ■ Applicable existing pipe diameters: 200 to 700 mm, etc. *For more details, please download the PDF or contact us.

  • Earthquake-resistant construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Bridge repair construction services

We will carry out a series of construction work from scaffolding to painting!

Our company conducts "bridge repair work" such as cross-section restoration work, footing mortar repair work, and crack injection work. We have been performing cross-section restoration work for over 20 years and are capable of handling any materials. Please feel free to consult us if you have any requests. 【Main materials used (cross-section restoration work)】 ■ Elehon Fix TS ■ Lion GRLC-J *For more details, please download the PDF or feel free to contact us.

  • Renovation and repair methods
  • Bridge Construction

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Flyer Method "NALT Method"

A fryer method that allows for uniform stirring within the hole through suction circulation from the bottom, making cost reduction possible.

The "NALT method" allows for a high discharge rate of 3m³ per minute due to tornado rising, which shortens the mixing time, and the mixing condition at the bottom can be confirmed with specific gravity samples from the discharge outlet. By adding materials within the circulation, it is possible to reduce the amount of cement added by 10-20%, which leads to high-strength solidification. The amount added is not affected by unexpected variations in pile diameter, pile length, or changes in injection volume due to groundwater. Please feel free to consult us if you have any requests. 【Features】 ■ No need for mixing machinery ■ Pull-out over two days is possible ■ Reliable cement quantity addition ■ No influence from plant conditions ■ No need for plant equipment *For more details, please download the PDF or feel free to contact us.

  • Civil Engineering Method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

High-pressure gas container re-inspection service

Leave the re-inspection of high-pressure gas containers to us!

We conduct re-inspections of high-pressure gas containers. We mainly handle two types of containers: LP gas containers and general gas containers. Containers that fail inspection or are requested for disposal are processed as scrap. Please feel free to contact us if you have any requests. 【Handled Containers】 ■ LP Gas Containers - Household containers, LP gas vehicle containers, forklift containers, large containers ■ General Gas Containers - Oxygen, nitrogen, argon, carbon dioxide, nitrous oxide, hydrogen, etc. *For more details, please download the PDF or feel free to contact us.

  • maintenance
  • Gas equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Footingless Panel Method (R)

Free-standing retaining wall construction method without a base slab.

Our company offers the economical and easy-to-construct "Footingless Panel Method (R)." Since it does not have a base slab, it allows for high flexibility during construction and is effective in sites where excavation width is limited. It is also cost-effective as there is no need for large machinery or ground improvement. Steel pipe piles are installed to create a retaining wall on columnar ground improvement bodies, making it possible to construct on ground with an N value of 3 or higher. Please feel free to contact us if you have any inquiries. 【Features】 ■ Effective in sites where excavation width is limited ■ Economical in sites with poor ground conditions ■ Possible to construct in narrow sites *For more details, please download the PDF or contact us.

  • Ground foundation construction method

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Heat insulation method "Top Heat Barrier"

For energy conservation and measures against global warming!

Our company offers the heat insulation method "Top Heat Barrier." For outdoor heat insulation, it can be widely used not only for building roofs and exterior walls but also for outdoor equipment such as outdoor tanks and air conditioning outdoor units, as well as in the agricultural sector. Additionally, for indoor heat insulation, there is no need for a reflective air layer on the heat source side, meaning there is no need to create space with spacers or similar materials, allowing for a shorter construction period and lower costs. 【Product Lineup】 ■ Outdoor heat insulation ■ Indoor heat insulation ■ High-temperature equipment insulation ■ Outdoor equipment insulation ■ Tent insulation *For more details, please download the PDF or feel free to contact us.

  • Heat insulation and heat shielding methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Nuri-form (spray painting, single coat)"

Maintenance is easy after painting! The original paint has excellent durability, weather resistance, and chemical resistance.

"NuRiForm" is our unique remodeling method that involves direct spray painting on existing bathrooms. In addition to bathtubs, it is also possible to paint three-dimensional surfaces and components within the bathroom, such as counters and bathtub aprons. Since it can be applied to floors, walls, and ceilings, we also recommend a complete NuRiForm for the entire bathroom. In the unlikely event that stubborn stains or small scratches occur, they can be easily restored by polishing with compound. If there are chips in the paint film or scratches that cannot be removed with compound, partial maintenance repairs can be done with touch-up repairs. [Features] - Excellent for painting curved substrates like bathtubs - Original paint that is resistant to dirt - Can be used for a long time in a clean condition - Easy maintenance after painting *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation
  • Renovation Design
  • Plastering and painting work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Construction method "Hareform (floor sheet installation)"

Since it is simply applied over the existing floor, the installation takes about half a day to complete! An environmentally friendly ecological method.

"Hariform" is a renovation method that involves directly applying decorative sheets to the walls and ceiling of the bathroom, and attaching foam multilayer vinyl flooring to the floor. It uses a high-performance CF sheet specifically designed for bathroom floors, allowing for an easy refresh of just the floor. Since it is simply applied over the existing floor, the installation takes about half a day to complete. Additionally, because it is made of a cushioned foam sheet, it has excellent thermal insulation properties. If the existing floor is tiled, it can get quite cold in winter, but by applying this flooring material, it provides excellent insulation, making it less likely to feel chilly when touched with bare feet, thereby reducing the risk of heat shock. [Features] - High-performance flooring sheet specifically for bathrooms - Measures against heat shock - Can be installed without damaging the existing floor - No waste or noise generated *For more details, please refer to the PDF materials or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Eco Bus Reform: Bathroom Insulation Renovation

Easy to install! It creates a safe and comfortable bathroom environment that you can enjoy bathing in with peace of mind, even in winter.

Transform your existing bathroom into a warm unit bath style! You can easily remodel with foam CF sheets specifically for bathroom floors and water-resistant foam resin panels (3mm thick) that are antibacterial and mold-resistant. It's also fine for small bathrooms or those that cannot be replaced with a unit bath. We will cut the materials to fit the current size, ensuring a perfect and clean finish without gaps! In addition to a bathroom-specific floor sheet that won't feel "chilly" even in winter, the ceiling and walls are wrapped with decorative panels made from foamed resin to minimize temperature drop inside the bathroom and maintain warmth. The decorative panels for water areas have a flat surface that resists dirt, and the anti-mold and antibacterial features make daily maintenance very easy. 【Features】 - Ideal for bathrooms that cannot accommodate a unit bath! - Remake even small bathrooms into a unit bath style - Minimal waste as existing bathrooms are not demolished - Custom-made with free choice of colors and patterns! Create your ideal bathroom space ◎ - Choose remodeling areas according to your budget - Windows, doors, and fixtures can also be newly installed together *For more details, please refer to the PDF document or feel free to contact us.

  • Renovation
  • Renovation Design
  • Insulation work

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Wall regeneration method "e-coat(R) series"

Developed with high product strength and technological capability! Consideration is also given to the global environment.

The "e-coat(R) series" is a wall restoration method that rejuvenates surfaces to like-new condition without the need to replace wallpaper, providing a beautiful living space. It contributes to environmental issues by reducing waste generated during wallpaper replacement, harmful substances released during combustion, and the need for new resources. Please feel free to contact us if you have any inquiries. 【Lineup】 ■Standard ■Sound-absorbing board ■Diatomaceous earth *For more details, please download the PDF or contact us.

  • Renovation and repair methods

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Machinery and equipment manufacturing services

Please leave everything from the planning stage to completion to us!

Our company manufactures various machinery and equipment, including FA systems, labor-saving devices, and conveyors, with professionals in three different job categories. By seamlessly collaborating in technical sales, mechanical design, electrical control design, robot control, and mechanical assembly, we enable flexible development and speedy production. You can entrust us with the design, manufacturing, assembly, on-site installation, and maintenance of various production equipment, from the conceptual stage to completion. Please feel free to consult us with your requests. 【Our Strengths】 ■ Capable of handling everything from concept to final installation ■ We have an in-house design department ■ We respond firmly to customer requests, gaining trust and stability ■ We have a passion and culture for solving customer problems *For more details, please download the PDF or feel free to contact us.

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration