Achieve planned energy conservation without changing the environment! Here are some examples of utilization.
Here is an introduction to a case study of the implementation of ESCO-ONE in hospitals.
In the case of Koga City, Ibaraki Prefecture, it was implemented for 25 air conditioning systems. This resulted in an annual reduction of 73,561 kWh in electricity consumption, a decrease in contracted power (maximum demand) of 49 kW, and an estimated savings of approximately 1,815,000 yen in electricity costs.
In a hospital in Hachioji City, Tokyo, it was implemented for 34 air conditioning systems, successfully achieving an annual reduction of 254,549 kWh in electricity consumption, a decrease in contracted power (maximum demand) of 89 kW, and an estimated savings of approximately 4,460,000 yen in electricity costs.
[Case Summary]
■ Hospital (Yamanashi Prefecture)
- Implemented for 9 air conditioning systems
- Annual reduction of 24,228 kWh in electricity consumption
- Decrease in contracted power (maximum demand) of 11 kW
- Estimated savings of approximately 578,000 yen in electricity costs
*For more details, please refer to the PDF document or feel free to contact us.