List of Construction Works products
- classification:Construction Works
1801~1845 item / All 11409 items
Clear visibility with transparent glass! Recommended for store and building entrances.
- Disaster prevention fittings
- Entrance/Exterior Doors
Environmentally friendly, safe, and stable heat-retaining heating curing sheet!!
- Concrete construction
Tatami mats using "Evergreen," the first tatami surface to obtain SIAA certification for antiviral properties in the tatami industry.
- tatami
- Interior construction
A new sensation tatami that combines comfort close to natural materials.
- tatami
- Spatial Design
- Interior construction
Introduction of tatami mats that are free from chemical substances! Excellent in anti-mold, antibacterial, and antiviral properties.
- tatami
- Interior construction
- Spatial Design
The Linda Pter is a clamping system that quickly and securely fastens H-shaped steel, channel steel, angle materials, and more with high strength.
- Steel construction
☆★☆★☆ Linda Pter Collection achieved 1st and 2nd place in the catalog rankings from 05/04 to 05/10. Thank you!!! ☆★☆★☆
This is Nippon Drive It Co., Ltd. We recently registered new catalogs: - Linda Pter Usage Example Collection - Linda Pter Application Proposal Collection These achieved ☆ Catalog Ranking 1st and 2nd ☆ from May 4 to May 10. Additionally, in the product rankings, - Linda Pter High Strength and Speedy Steel Joining System achieved ☆ Ranking 1st ☆. Thank you to everyone for your interest. Whether you are considering specific implementation or just gathering information, please feel free to contact us with any questions or points you would like to know more about. If you haven't read the materials or viewed the product pages yet, we would greatly appreciate it if you could take a look. We look forward to your continued support of our company and our products.
The Linda Pter is a clamp system that quickly and securely fastens H-beams, channel steel, angle materials, and more without the use of fire.
- Steel construction
Flames and sparks are less likely to penetrate the interior of the form, reducing fire risk. Insulation material with non-combustible properties.
- Hard urethane foam
- Insulation work
Protecting beauty and durability. Regular painting can prevent large-scale repairs and maintenance.
- Plastering and painting work
We will swiftly and consistently carry out the investigation, design, material procurement, and construction work for the "power receiving equipment" and "grid connection lines" of solar power plants,...
- Unit and other construction
Manage and share photos, electronic blackboards, and drawings for each construction project. Everyone can grasp "the current situation on site" from anywhere and utilize the data collaboratively.
- Waterproofing work
Electronic Blackboard Share No.1 "Kuraemon Pad" Fully Supports Electronic Delivery for Public Works Projects - All Applicants! 100,000 Yen Cash Back Campaign Starts
The "Kuraemon Pad," Japan's No. 1 electronic blackboard developed and sold by Lukure, has fully adapted to electronic submissions for public works projects. By using it in conjunction with the construction photo management software "Kuraemon Goyotashi 17 Professional," the creation of blackboards with construction photo information and the sorting of construction photos into ledgers have been automated in accordance with the digital photo management information standards (draft) set by the Ministry of Land, Infrastructure, Transport and Tourism, NEXCO, and the Metropolitan Expressway. This will reduce the time spent on construction photo tasks at public works sites, such as civil engineering projects, by a quarter. Additionally, starting today, the "New Technology Information Provision System (NETIS) Registration Commemoration 100,000 Yen Cashback Campaign" has begun. The electronic blackboard has been approved for use in direct construction projects by the Ministry of Land, Infrastructure, Transport and Tourism, and is attracting significant attention as a product that contributes to labor-saving in the construction industry, which is facing a labor shortage ahead of the 2020 Olympic and Paralympic Games. The "Kuraemon Pad," which has captured the No. 1 market share in the electronic blackboard market, is a tablet-type electronic blackboard that integrates a construction blackboard and a digital camera, and is also registered with NETIS. It has been implemented at over 10,000 sites nationwide, including Obayashi Road, Nishimatsu Construction, and Kitano Construction.
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 and M52 to M80! Base plate oversized hole filling material.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misaligned anchor bolts? *Sample available.
- Steel construction
Avoid performance-related issues such as re-leveling the platform and re-drilling holes in the base plate that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
Creation of unwavering value, uncompromising factory design. We provide earthquake measures tailored to our customers.
- Vibration isolation, vibration control, and earthquake resistance construction
- Earthquake-resistant construction method
- Architectural design office
Solar 24-hour ventilation fan with zero driving cost | Equipped with two USB outputs for smartphone charging useful during disasters.
- Ventilation and smoke exhaust equipment
- Ventilation system
- Insulation work
Increased airflow "Solar 24-hour ventilation fan"
Are you struggling with high airtightness and high insulation homes, particularly with winter condensation, mold, and sick house syndrome? In winter, neglecting ventilation can lead to moisture accumulation, causing condensation and mold growth, as well as promoting dust mite proliferation. Additionally, harmful substances emitted from building materials and furniture can contaminate the air, leading to sick house issues. We also address the problem of ventilating vacant or unoccupied homes without the need for power or switch operation, achieving 24-hour ventilation. This is the ultimate eco-friendly ventilation fan. Ventilation airflow: The typical airflow during normal operation is about 55 cubic meters per hour, capable of 24-hour ventilation for a maximum of 30 tatami mats, with a ventilation frequency of 0.5 times/hour. Room volume: 6-tatami room - approximately 23 cubic meters, 8-tatami room - 31 cubic meters. CO2 reduction: When converted to electricity usage, it results in a reduction of 3.4 kg of CO2 annually. Compared to products with similar airflow that use standard power, it achieves double the reduction at 4.5 kg of CO2.
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work
We propose equipment that is excellent in resource and energy-saving effects, environmentally friendly, efficient, and economical!
- Insulation work
Focusing on plumbing and sanitation work, we consider the scale and purpose of each facility, as well as the characteristics of the buildings, to ensure a safe water supply and hygienic drainage!
- Insulation work
A system for supplying explosion-proof paint, the "Syringe Pump System," that simultaneously solves quality, cost, and environmental issues is now available for individual sale.
- Plastering and painting work
- paint
Start of standalone sales for the paint supply device "Syringe Pump System".
The explosion-proof paint precision metering supply device "Syringe Pump System," developed specifically for painting, has started individual sales in response to customer requests. We have met the demands for Takubo's syringe pump. The Syringe Pump System allows for precise control of paint in 1cc increments, enabling numerical management and reducing unnecessary paint consumption. This paint supply device is standard equipment on Takubo's robots. There are two types: a circulation type and a one-cup type. Gun tip control (CC-LINK) is available as an option, subject to consultation. It can be integrated into existing painting robot systems. For more details, please contact Takubo Engineering Co., Ltd. Sales Engineering Department at 0475-50-0211 or visit the Takubo website at https://www.takubo.co.jp/contact/ for inquiries.
We will propose the optimal smoking room based on the installation location, building structure, and customer requests.
- Interior construction
A time when two robots can choose appropriate actions and work while conversing with each other through AI!
- Interior construction
Able to communicate and collaborate! Achieving high-precision work.
- Interior construction
Anchor bolt diameter M12 and compatible with M52 to M80! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misalignment of anchor bolts? *Sample available.
- Steel construction
Avoid performance-related issues such as re-leveling of the platform and re-drilling of the base plate holes that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
Avoid performance-related issues such as the previously conducted adjustments to the table and re-drilling of holes in the base plate! *Sample available for provision.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever experienced trouble due to misalignment of anchor bolts? *Sample available.
- Steel construction
Compatible with anchor bolt diameters M12 and M52 to M80! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
Avoid performance-related issues such as the previously conducted adjustments to the platform and re-drilling of base plate holes! *Sample available upon request.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misaligned anchor bolts? *Sample available.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
Anchor bolt diameter M12 and M52 to M80 compatible! Base plate oversized hole filling material.
- Steel construction
Avoid performance-related issues such as re-leveling and re-drilling holes in base plates that have been carried out in some areas until now! *Sample available upon request.
- Steel construction
"Ah! It's misaligned, what should I do?" Have you ever had trouble with misalignment of anchor bolts? *Sample available.
- Steel construction
Anchor bolt diameter M12 and M52 to M80 compatible! Base plate oversized hole filling material.
- Steel construction
Compatible with anchor bolt diameters M12 to M80! Base plate oversized hole filling material.
- Steel construction
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work
In addition to office buildings, we carry out insulation and soundproofing work in hospitals, welfare facilities, public facilities, factories, etc., minimizing heat loss through various construction ...
- Insulation work