List of Construction methods and technologies products
- classification:Construction methods and technologies
1~45 item / All 6284 items
Easily connect pipes with different outer diameters! A fitting suitable for emergency repairs of buried pipes.
- others
[Special Offer Available] Max Tube Marker Lettwin
- Wiring devices
- Interior and exterior construction accessories
- Renovation and repair methods
Reiwa Year 7 Sennan Region Manufacturing Promotion Seminar and Exhibition Exchange Meeting (at Miyagi Prefecture Okawara Joint Government Building, 4th Floor "Large Conference Room") Organized by Sennan Wide Area Industrial Association and Miyagi Prefecture Okawara Regional Promotion Office.
On November 14, the "2025 Sennan Region Manufacturing Promotion Seminar and Exhibition Exchange Meeting" will be held. Nichiko Electric Co., Ltd. will also present improvement case studies at the Kaizen presentation session. Since it is a pre-registration system (free of charge), we would be grateful if you could apply and attend on the day. ◎ 2025 Sennan Region Manufacturing Promotion Seminar and Exhibition Exchange Meeting (Pre-registration required, free of charge) Date and Time: November 14, 2025 (Friday) 12:40 PM - 4:40 PM Venue: Miyagi Prefecture Okawara Joint Government Building, 4th Floor "Large Conference Room" (Address: 129-1 Minami, Okawara Town, Shibata District, Miyagi Prefecture) Organizer: Sennan Wide Area Industrial Association (NPO), Miyagi Prefecture Okawara Regional Promotion Office Co-sponsor: Miyagi Prefecture Business Owners Association Sennan Branch Miyagi Prefecture Okawara Regional Promotion Office, Regional Promotion Department (Contact: Yokoyama) TEL: 0224-53-3199 / FAX: 0224-53-3076 Please fill out the attached application form and apply via email. Application Deadline: October 27, 2025 (Monday) (Note) Members of the Sennan Wide Area Industrial Association (NPO) should also apply by the above date.
To reduce "slipping and danger," make wet and slippery tiles or stones less slippery. Non-coating anti-slip treatment for floors.
- Special Construction Method
Over 90 construction achievements! We support bridge pier reinforcement nationwide with "shortened construction periods and expanded application scope"!
- Renovation and repair methods
[Catalog Renewal] Tentative Deadline LPF Method Construction Achievements / Japan Ocean Services Co., Ltd.
The "Temporary Closure LPF Method" is a construction method that builds temporary closures for underwater structures such as rivers, seas, and dams using liner plates. The Temporary Closure LPF Method contributes to shortening construction periods and securing holidays as follows: - Reduces the production of custom components for each pier. - Selects the optimal shape based on site conditions. It can be implemented using manual labor alone and is feasible in environments with a headroom restriction of approximately 1.0 meters or less. *Please refer to the case study collection that includes examples of the construction achievements of the "Temporary Closure LPF Method." 【Features】 ■ Composed of liner plates, H-beams (reinforcement rings), and supports. ■ Assembled in a cylindrical shape above the water surface and installed underwater. ■ Construction is possible with a headroom restriction of approximately 1.0 meters! *Achievement at 1.2 meters. ■ Vibration-free construction is possible in narrow areas!
Slope protection works specialized for alkaline soil, such as embankments and tunnel spoil using cement-based solidifying materials (for ponds, retention basins, road improvements, and riverbank prote...
- Slope protection material
- Baskets and futon baskets
- Civil Engineering Method
Support for the development and career advancement of civil engineering construction management professionals! This is an online learning service where you can earn up to 30 CPDS units.
- Civil Engineering Method
- E-learning
- Construction and process management software
From updating aging equipment to custom control panel manufacturing. We solve our customers' challenges that require sustainable machinery and equipment systems!
- Power distribution and control panels
- Renovation and repair methods
Leave it to Meiwa Kogyo! Updating aging equipment and custom control panel manufacturing.
In recent years, for industrial plants and buildings with machinery that have been in operation for a long time, efficient inspection, maintenance, and updates have become urgent measures against equipment aging. Meiwa Kogyo provides services that ensure the sustainable operation of various machinery, including pumps, surrounding equipment, and piping, to solve our customers' challenges! 【Long-term Maintenance Service】 Our professionals, who have extensive experience and know-how in mechanical and electrical equipment, offer the necessary services for the sustainability of machinery. ■ Proposing truly necessary maintenance ■ Material selection from a wide range of suppliers ■ Manufacturing replacement parts at our domestic factory ■ Low cost and long lifespan 【Control Panel Design and Manufacturing Service】 With years of accumulated experience and technical skills in welding, machining, and design, we can handle maintenance and updates that include disassembly, repairs, and manufacturing of replacement parts. Our professionals, who have many achievements and know-how, also provide custom control panel design and manufacturing tailored to customer needs. ■ Custom control panels ■ Support for remote monitoring and operation systems using the cloud ■ High quality from professionals with extensive experience and know-how ■ One-stop service from the removal of existing equipment to installation completion
A lineup of "low-temperature" products that can be installed at temperatures ranging from -5℃ to 15℃ is also available!
- Civil Engineering Method
Flame-retardant epoxy resin-based adhesive can be used to ensure flame resistance, self-extinguishing properties, and safety of generated gases!
- Civil Engineering Method
We would like to introduce the concrete surface protection methods that we handle!
- Civil Engineering Method
Introducing a peeling prevention method that can be implemented without using nets in sub-zero temperatures!
- Civil Engineering Method
The incredible performance achieved by the one-component high-strength urethane coating!
- Civil Engineering Method
Comparison of construction methods and processes / The reason why the construction time is overwhelmingly fast.
- Ground foundation construction method
80% reduction in concrete waste! We will proceed with repair work smoothly and quickly!
- Renovation and repair methods