List of lift products
- classification:lift
331~360 item / All 472 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Supports loads of 200 to 500 kg! A dedicated freight elevator that can transport small packages along with the cart.
- lift
- Small baggage lift
- Elevator installation work
We can offer a wide range of proposals tailored to your industry! Here are examples of installations of dedicated small cargo elevators.
- lift
- Elevator installation work
- Small baggage lift
The compact type of the small cargo elevator is a modular design integrated with the shaft! That's why a "one-day construction period" is achievable.
- lift
- Small baggage lift
- Elevator installation work
This is a compilation of common concerns that arise during the installation of elevators, such as 'I want to use it during renovation and repair work' and 'I want to transport cardboard boxes, trays, ...
- maintenance
- Elevator installation work
- lift
Wipe off the oil stains with detergent and a cloth to eliminate the slipping of the hyper lift.
- maintenance
- Elevator installation work
- lift
The door wire worn due to years of use has been replaced.
- maintenance
- Elevator installation work
- lift
Due to aging and deterioration over time, the main wire was replaced and oil was supplied to each rail.
- maintenance
- Elevator installation work
- lift
The button was unresponsive due to poor contact in the internal connection, so it was replaced.
- maintenance
- Elevator installation work
- lift
If you have any questions about lift and elevator renewal and maintenance, please feel free to contact us!
- maintenance
- Elevator installation work
- lift
The wire used for the outer door was broken, causing the door to become inoperable, so we replaced the wire rope.
- maintenance
- Elevator installation work
- lift
The door interlocking rope at the second-floor platform was broken, so we carried out the replacement work for the door interlocking rope.
- maintenance
- Elevator installation work
- lift
The operation has become smoother due to the replacement work of the basket guide shoe.
- maintenance
- Elevator installation work
- lift
We carried out the replacement work for the malfunctioning unloading port button.
- maintenance
- Elevator installation work
- lift
All the old door pulleys on the 1st, 2nd, and 3rd floors have been replaced.
- maintenance
- Elevator installation work
- lift
Due to aging deterioration from long-term use, all buttons of the dumbwaiter have been replaced.
- maintenance
- Elevator installation work
- lift
Complete removal and renewal from the elevator to a simple lift! Renovation work has been carried out.
- maintenance
- Elevator installation work
- lift
The unloading door rope was damaged and had a wire break, so it was replaced during the inspection.
- maintenance
- Elevator installation work
- lift
I replaced the basket door guide shoe and installed the door stopper rubber.
- maintenance
- Elevator installation work
- lift
The lever roller part of the limit switch has been replaced.
- maintenance
- Elevator installation work
- lift
Due to wire breakage occurring from usage methods, we replaced the wire rope for the door.
- maintenance
- Elevator installation work
- lift
The door wire of the simple lift that stops on the 1st and 2nd floors has been replaced.
- maintenance
- Elevator installation work
- lift
The intercom was replaced from the B1 floor to the 2nd floor due to a malfunction caused by aging deterioration.
- maintenance
- Elevator installation work
- lift
The boarding equipment was refurbished by using existing components and replacing the control methods.
- maintenance
- Elevator installation work
- lift
A dumbwaiter has been installed to transport food and drinks from the kitchen on the first floor to the dining area and banquet hall on the second floor.
- lift
- Small baggage lift
- Elevator installation work
A damper was installed using wedges to secure it to the wooden structure.
- lift
- Small baggage lift
- Elevator installation work
A compact dumbwaiter with dimensions of 870mm in width and 870mm in depth has been installed.
- lift
- Small baggage lift
- Elevator installation work
By being able to transport without using stairs, the burden on employees is reduced, and warm dishes can be delivered quickly.
- lift
- Small baggage lift
- Elevator installation work
Since it is locally assembled, basically no welding or similar work is required, and the installation work can be completed in one day!
- lift
- Small baggage lift
- Elevator installation work
A new dumbwaiter has been installed to transport food and drinks from the kitchen on the first floor to the dining area on the second floor.
- lift
- Small baggage lift
- Elevator installation work
We have newly installed a small freight elevator by utilizing the opening created for the installation of the stairs as is.
- lift
- Small baggage lift
- Elevator installation work