You won't have time to evacuate from the earthquake to the tsunami's arrival! This is a "tsunami shelter" that dramatically increases survival rates against the tsunami approaching at a tremendous spe...
- Basement unit/disaster prevention shelter
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Injecting even 0.01 mm fine cracks while removing air! With high density, high depth, and high diffusion filling, extending the lifespan of rebar and concrete structures!
- Renovation and repair methods
Creating an environment that protects life and livelihood. Dissemination of reliable technology.
- Renovation and repair methods
Explanation materials about the IPH system (internal pressure filling joint reinforcement method).
- Renovation and repair methods
For repairs and reinforcement of concrete and mortar in all fields! Long-term durability enhancement system.
- Renovation and repair methods
High-density filling even for fine cracks of 0.01 mm with ultra-low pressure injection while removing air. *Numerous construction achievements within Aichi Prefecture.
- Renovation and repair methods
High technology and high quality. Leave the replacement of automotive windshields to us.
- Renovation and repair methods
- others
Please feel free to consult us not only about your concerns regarding glass but also about issues related to screens and sashes.
- Renovation and repair methods
- Glass construction
Are you spending time on part replacements and dangerous cleaning tasks due to wear and damage at the manufacturing site? Here’s a new coating that reduces maintenance costs!
- Renovation and repair methods
Ceramic paint that restores the strength of deteriorated concrete.
- Renovation and repair methods
There is an increasing number of houses with structures that make general termite control work (such as underfloor pesticide application) difficult. These include foundation-insulated homes, air cycle...
- Renovation and repair methods
Due to weak ground, ground subsidence! Only the ground is sinking, creating gaps under various floors within the building.
- Renovation and repair methods
Due to ground subsidence, the classroom floor has sagged! The floor subsidence was corrected in a short construction period of one day.
- Renovation and repair methods
Concerns about children's safety and health! A case of correcting the floor sag in the classroom within a short construction period.
- Renovation and repair methods
Due to the impact of the Great East Japan Earthquake, a void has formed beneath the hall! Filling work using urethane.
- Renovation and repair methods
Quickly repair the middle school gymnasium! Injecting urethane resin to ensure there is no strain on the concrete floor.
- Renovation and repair methods
Up to 60mm of subsidence in the central Slavic region! Ground consolidation and strengthening with the foaming pressure of polyurethane resin.
- Renovation and repair methods
The gymnasium floor that has sunk and warped due to an earthquake and ground subsidence! Short construction period correction using the Upcon method.
- Renovation and repair methods
Due to the impact of the earthquake, the gymnasium floor has significantly sunk in a bowl shape! A case resolved using the Upcon method.
- Renovation and repair methods
Our company can offer construction proposals tailored to your needs, such as projects aligned with school events!
- Renovation and repair methods
The floor has sunk due to consolidation settlement! Voids (cavities) can be seen under the floor, and we will carry out construction.
- Renovation and repair methods
Utilizing spring break for quick subsidence correction! The cycle from construction to restoration is short.
- Renovation and repair methods
The foamed urethane resin compressively strengthens the ground! It suppresses the occurrence of voids, cavities, and gaps after construction.
- Renovation and repair methods
Refresh deteriorated concrete structures! Prevent the intrusion of water and carbon dioxide.
- Renovation and repair methods
Can be constructed without removing the existing roof! Suitable for large-scale roof renovations in factories and similar facilities.
- Renovation and repair methods
A water-stopping method that helps shorten construction periods and reduce areas affected by water outages!
- Special Construction Method
- Renovation and repair methods
- Piping Equipment
Corrected a maximum settlement of 46mm! A case that resolved the distortion of the door frame caused by settlement.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
No need for large-scale demolition work! Here is an example of correcting a settlement of up to 95mm in just two days of construction.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Renovation and repair methods
- Ground foundation construction method
- Road construction
An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Performed correction of the toll booth subsidence! Partial corrections were also carried out in areas where there was a step difference with the U-shaped drainage ditch.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Conducted resin injection work while managing levels! A case completed in 4 days.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Repairing the apron step and gaps without removing the apron! A case where our method was adopted.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Correction of road surface irregularities in a short construction period! Introducing examples of port facility repair work.
- Renovation and repair methods
- Harbor Construction
- Ground foundation construction method
Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
The ground floor slab has sunk due to the earthquake! A case study of improvements made to the gaps between the floor and walls, and between the walls and ceiling.
- Renovation and repair methods
- Ground foundation construction method
- Special Construction Method
Our method, which raises the CO pavement slab using the foaming pressure of rigid urethane resin, has been adopted!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Settlement correction while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method