List of Elevator installation work products
- classification:Elevator installation work
166~180 item / All 319 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Introduced for the early delivery of dishes and other items. It is used to carry dishes, trays, and more!
- lift
- Small baggage lift
- Elevator installation work
The height per section is about 21 cm! It is possible to carry not only yakitori but also large-sized beer mugs together.
- lift
- Small baggage lift
- Elevator installation work
Adopting all stainless steel that is strong against water! It can be used hygienically for a long time.
- lift
- Small baggage lift
- Elevator installation work
Lift up and down with various products! You can smoothly transport dishes from the first floor to the second floor.
- lift
- Small baggage lift
- Elevator installation work
We will introduce an example of a through-type installation where the entry and exit directions on the first and second floors are different.
- lift
- Small baggage lift
- Elevator installation work
Japanese cuisine that needs to be handled with care. The inverter control helps to soften the shock.
- lift
- Small baggage lift
- Elevator installation work
Including materials, a wide variety of products can be raised and lowered! The control panel is colorful and easy to read, allowing you to perform the desired operation immediately.
- lift
- Small baggage lift
- Elevator installation work
A dumbwaiter has been installed to transport food from the kitchen on the first floor to the table seats on the second floor.
- lift
- Small baggage lift
- Elevator installation work
A dam waiter has been introduced to reduce labor costs and improve safety!
- lift
- Small baggage lift
- Elevator installation work
A dumbwaiter has been introduced because there are second-floor seats in the store! It will be used to transport dishes and other items up and down.
- lift
- Small baggage lift
- Elevator installation work
Constructed the second store of "Atagoya"! It was introduced to transport food and drinks from the first floor to the second floor.
- lift
- Small baggage lift
- Elevator installation work
A dumbwaiter has been introduced to transport food and drinks prepared in the kitchen on the first floor to the dining area on the second floor!
- lift
- Small baggage lift
- Elevator installation work
No need for elevator shaft construction; we installed a compact type that integrates the exterior and only requires an opening in the second-floor floor!
- lift
- Small baggage lift
- Elevator installation work
The integrated exterior design eliminates the need for elevator shaft construction! It can be installed in narrow spaces by simply creating an opening in the second-floor slab.
- lift
- Small baggage lift
- Elevator installation work
If you can secure the installation space, the installation work will be completed in one day!
- lift
- Small baggage lift
- Elevator installation work