List of Unit and other construction products
- classification:Unit and other construction
901~945 item / All 996 items
You won't have time to evacuate from the earthquake to the tsunami's arrival! This is a "tsunami shelter" that dramatically increases survival rates against the tsunami approaching at a tremendous spe...
- Basement unit/disaster prevention shelter
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
A texture like natural wood and a safe space where children can play barefoot.
- Wood deck (synthetic wood/resin)
- Unit and other construction
A new design that uniquely colors the urban living space.
- Balcony/Sunroom Unit
- Tile work
- Unit and other construction
Everything is for kindness, comfort... and beauty.
- Balcony/Sunroom Unit
- Unit and other construction
[MINO Column] Reliable Balcony Railings with In-House Construction Responsibility (Part 1)
Beware of water leakage from balcony railings At MINO, we offer three types of balcony railings, including the Ayaki series, IDEEN (cast iron), and Line-zero (aluminum material). The biggest common feature of these products is that the manufacturer, MINO, is responsible for the installation under its own supervision. The main concern for MINO regarding balcony railings is "water leakage." The sealing materials used at the installation points of the balcony railings can deteriorate quickly depending on the construction method. The deterioration of the sealing material leads to shrinkage, which can create gaps at the installation points between the balcony and the railing. If rainwater or other elements enter through these gaps, the risk of water leakage to the lower floors increases significantly. Design and construction that ensure reliable primary waterproofing To address this, MINO protects the areas where sealing materials are used by adding covers, taking measures from the design stage to prevent exposure to UV rays, wind, and rain. For more information, please refer to the related information below.
By changing the air volume adjustment from traditional damper opening and closing to inverter control, power consumption is reduced.
- Automatic Control Equipment
- Unit and other construction
- Power distribution and control panels
This is just one example. We have included representative items.
- Ventilation and smoke exhaust equipment
- Unit and other construction
- Air compressors, blowers and pumps
Drainage unit Ogawa-kun option lateral waterproof box
- Drainage and ventilation equipment
- Waterproofing work
- Unit and other construction
Equipped with sterilization and deodorization functions! This is a compact air purifier that can be placed on a desk.
- Unit and other construction
Just by applying it to polished stone or tile floors that become slippery when wet with rainwater, it won't be slippery even when wet!
- Bathroom unit
- Tile work
- Unit and other construction
We will provide proposals that combine safety and harmonize with the streetscape and landscape.
- Unit and other construction
"Palm-sized water leak detector" - A new standard for water leak prevention that is easy to install in small spaces.
- Other interior and exterior systems and units
- Waterproofing work
- Unit and other construction
The light that lit up upon detecting the tremor was powered by indoor light.
- Unit and other construction
Subtle, inconspicuous. That's how a rain gutter should be.
- Unit and other construction
Design and manufacture pharmaceutical water production equipment (WFI) and preparation facilities essential for drug manufacturing.
- Unit and other construction
New product of sealing unit that facilitates electrical work for building renovations and extensions.
- System ceiling
- Unit and other construction
The installation of the ceiling-mounted fire alarm can be easily done from indoors. / New product for ceiling-mounted fire alarm brackets.
■Overview of Ceiling Space Fire Alarm Device 1. It consists of a mounting frame and a cover, with the ceiling finishing material fitted into the cover and a stand combined with the mounting frame, forming a ceiling space fire alarm device. 2. The ceiling space fire alarm device is attached to the ceiling finishing material, and a wireless linked fire alarm unit is mounted on the top of the stand, while the main unit is attached to the cover, allowing for the detection of fires in both the ceiling space and the room simultaneously. 3. A fire alarm can be mounted on the top of the stand, and an additional buzzer can be attached to the cover, with the devices connected by signal wires. 4. A fire alarm unit can be mounted on the top of the stand, and the main unit can be attached to the cover. A hole is drilled from the room into the ceiling finishing material, and the ceiling space fire alarm device is fitted into that hole, allowing for easy and aesthetically pleasing installation without discomfort. 5. Fire testing and inspection of the main unit attached to the cover and the ceiling space unit mounted on the top of the stand can be easily performed from inside the room. 6. For example, if a fire occurs in the ceiling space of a residence, the ceiling space fire alarm (subunit) detects the fire and triggers an alarm, while the fire alarm (main unit) in the cover also sounds an alarm inside the room. This allows for early detection of fires in the ceiling space.
Achieving durability, workability, and cost performance, we propose a comfortable office space.
- Floor and equipment composite system
- Other interior and exterior systems and units
- Unit and other construction
As a total service supplier, we respond meticulously to a variety of needs, from individual sales of electronic components to production requests.
- Wiring devices
- Unit and other construction
We continue to support various industries with reliable product manufacturing and a wide range of offerings.
- Unit and other construction
Walking alongside clean energy, we respond to cutting-edge needs with high-quality products.
- Unit and other construction
PISCO Co., Ltd. will exhibit at the "Machine Elements Exhibition" held at Intex Osaka.
Mechanical Components Exhibition IN INTEX Osaka The "Mechanical Components Exhibition," held annually, will see Japan Pisco Co., Ltd. exhibiting again this year. We will be showcasing new products and look forward to your visit. Booth No. 19-26, Hall 4 Event Period September 24 (Wednesday) - September 26 (Friday), 2014, for three days We look forward to seeing many of you there.
Since it is a sanitary product, it can be used for cooling injection water and preparation water.
- Water supply facilities
- Unit and other construction
Simply transport and install the units produced in the factory on-site. Provide high-quality housing tailored to the intended use at low prices and with short construction periods.
- Unit and other construction
Hygienic with dust collection function! A basic type that condenses functionality into a simple design.
- pump
- Unit and other construction
- stone
Achieving about four times the efficiency of solar power! Renewable energy is advancing with new installations in Europe.
- Solar power generation equipment
- Unit and other construction
A combined unit of hydraulic unit and hydraulic cylinder, achieving high output, compactness, lightweight, and ease of use.
- Safety and consumables
- Unit and other construction
- Prime movers, torque converters, hydraulic equipment, generators
Indoor Work Unit Series
- Wiring devices
- Water and sewerage pipe fittings
- Unit and other construction
It is a comfortable flush toilet that can process wastewater on the spot without discharging it.
- Sanitary fixtures
- Unit and other construction
- Toilet
It is a comfortable flush toilet that does not require drainage and does not discharge wastewater.
- Sanitary fixtures
- Unit and other construction
- Toilet
It is a water-saving toilet equipped with a sewage and waste reduction device that allows for on-site waste disposal and is environmentally friendly.
- Water Supply Facilities
- Unit and other construction
- Crane and others
It is also ideal for preventing heat shock and addressing allergies.
- Floor and equipment composite system
- Other interior and exterior systems and units
- Unit and other construction
Even after the clean booth is installed, the HEPA filter can be replaced from the bottom.
- Ventilation and smoke exhaust equipment
- Unit and other construction
Integrated HEPA filter and blower fan. Available in various types with different airflow rates.
- Ventilation and smoke exhaust equipment
- Unit and other construction
It is an electric floor heating system with a built-in linear heating element and a triple safety structure, ensuring safety, energy efficiency, and comfort.
- Floor and equipment composite system
- Insulation work
- Unit and other construction
Revitalize the town with LED illumination lights for a new era!
- Other interior and exterior systems and units
- Unit and other construction
- Other commercial buildings and service facilities
A combination system upgrade with a full-scale module. It meets diverse needs!
- Automatic Control Equipment
- Water and sewerage pipe fittings
- Unit and other construction
Energy conservation through measuring energy usage. You can easily collect measurement data while keeping the budget for energy conservation in check.
- Unit and other construction
We can fundamentally reassess the costs associated with the design and creation of control panels!
- Unit and other construction
- Power distribution and control panels
Adopts a high-pressure two-stage charging method with high dust collection efficiency. Removes invisible dust such as pollen, viruses, tobacco smoke, and yellow sand. Achieves a comfortable air enviro...
- Unit and other construction
Exhaust deodorization system for animal breeding rooms using photocatalysts (commercial air purification device) with a proven track record of trust in major research institutes and national universit...
- Air conditioning equipment
- Unit and other construction
VOC removal device using photocatalysts (commercial air purification device) - A safe and secure structure that does not use fire or chemicals!
- Unit and other construction
Leave the design, manufacturing, and construction of custom wine cellars and refrigerated showcases to us.
- Showcases (for general store use, freezing, refrigeration, heat retention, etc.)
- Unit and other construction
It is suitable for applications such as foundations for embankments and revetments built on the sludge-like ground of lakes and marshes, as well as for preventing scouring of coastal stabilization wav...
- River construction
- Other civil engineering works
- Unit and other construction
Cold and hot water pipe cleaning service
- Unit and other construction
- maintenance
- cleaning
Gas fireplace Monte Rosa 600
- Residential interior systems
- Interior construction
- Unit and other construction
Measures against heat and heatstroke! A unit type with duct fan and mist fan!
- Cooling system
- Unit and other construction
- Air compressors, blowers and pumps
The four seasons of Japan show various expressions of nature due to the changing seasons, and the exterior of buildings also presents various expressions depending on the materials used for their wall...
- Building renovation system
- Insulation work
- Unit and other construction