List of Road construction products
- classification:Road construction
16~30 item / All 625 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Ground treatment and temporary construction work are simplified, resulting in a shortened overall construction period! Reduced total construction costs after completion.
- Road construction
This is a temporary sign for road construction. It uses prism high-brightness reflection, so it has excellent visibility even in a slim design.
- Road construction
- Tunnel construction
- Signs, banners, lanterns, and curtains
Automatic notification of information regarding heatstroke via business chat.
- Other civil engineering works
- Road construction
- Weather Survey
[ZEROSAI Implementation Case] Regional Development Bureau National Route No. 〇 Road Improvement Project
[Before Implementation] We want to share information about heatstroke on-site and improve safety measures for workers. <Challenges> It is necessary to obtain weather information that is relevant to the site. We need to monitor the Wet Bulb Globe Temperature (WBGT) and share information with all stakeholders in real-time. Using the Weather Forecast Analysis Distribution System [Disaster Prevention Panel], we conducted predictions of the Wet Bulb Globe Temperature (WBGT) and installed weather observation equipment [N Sensor] on-site to monitor the WBGT. Additionally, by linking the Disaster Prevention Panel with business chat, we efficiently shared information with stakeholders.
Shallow soil coverage allows for the installation of short and safe protective fences! Intersection-type flexible continuous foundation.
- Concrete block, ALC panel, extrusion molded cement board construction
- Road construction
The top part is wide, minimizing gaps and eliminating steps! It can accommodate various retaining wall and embankment structures.
- Protective fence
- Road construction
Clean, safe, and stable quality coal ash recycled subgrade material.
- Paving Materials
- Road construction
- Paving of sidewalks, roads, parking lots and stadiums
A pylon developed for use on highways.
- Road construction
- Paving of sidewalks, roads, parking lots and stadiums
- Car and bicycle parking facilities
A simple structure with excellent construction performance for preventing bamboo from falling.
- Road construction
- Railway Construction
- Other civil engineering works
Added "Bam Guard," a bamboo prevention fence to prevent bamboo damage that poses a danger to the road.
We have newly added the bamboo prevention fence "BamGuard" to our product lineup, which prevents damage from fallen bamboo to roads and ensures road traffic safety, and we have started sales. BamGuard is primarily installed along roads to catch bamboo that may fall due to strong winds or heavy snowfall. It is an ideal construction method for preventing road closures caused by fallen bamboo, ensuring safety for road users. With a simple structure and fewer components, it improves workability and reduces costs. Additionally, there are two types of post foundations available—"anchor foundation type" and "pile foundation type"—which can be selected based on site conditions, allowing for flexible responses to various situations. By adding the bamboo prevention fence to our lineup, we will flexibly address various needs at the site.
An LED tape light with excellent strength and waterproofing, capable of expressing a variety of colors (16 colors).
- LED light source/module
- Road construction
- Other lighting fixtures
A new foundation for Japan. A leader in valuable infrastructure development and creativity.
- Road construction
- Slope protection material
- River construction
High strength, 1350kN/m! The workability is suitable for a width of 4.5m and long roll length, compatible for 120 years.
- Road construction
Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together!
- Other civil engineering works
- Road construction
- Earthworks
[ZEROSAI Case Study] Private Company - Solar Power Plant Construction Project. Centralized management of on-site weather and camera footage in the cloud! View linear precipitation zones and typhoon information together! Achieving weather digital transformation (DX) using ICT!
Introducing a case study of the disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - There is a distance from the site office to the actual site, requiring personnel to move to confirm the site conditions. - During earthworks, it is necessary to be cautious of the flow of soil, so accurate understanding of weather conditions is essential. 【Operations to Solve the Challenges】 Please download the PDF for more details.
Cloud management of weather information automatically triggers alarms to ensure safety.
- Road construction
[Examples of Technical Proposal Utilization] ○○ Line Road Improvement Project Clarification of Work Suspension Criteria Automatic Alarm Activation for Safety Assurance Rainfall Measures Guerrilla Rainstorms ICT DX Remote Monitoring Guerrilla Rainstorms Electronic Display Boards Technical Proposals Creativity and Innovation
■On-site Issues: Focus Points in Evaluation During the construction period, sudden weather changes such as guerrilla rainstorms unique to mountainous areas are anticipated. These can lead to delays in various processes and a decline in quality, requiring extensive discussions for improvement, which in turn leads to further delays. For more details, please visit our company website or product release information. https://product.sysmet.jp/exercise/k_131.html
The addition of reflective material to the side of the bag has improved visibility during reflection.
- Road construction
- Car and bicycle parking facilities