List of Scaffolding and Support Materials products
- classification:Scaffolding and Support Materials
211~225 item / All 668 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
[Must-see for those considering labor-saving and manpower-reducing solutions at construction sites] A spacious work floor can be freely planned according to the schedule! It is also efficient as mater...
- Scaffolding and Support Materials
A must-see for those considering the use of new technologies and machinery as measures to address the labor shortage at construction sites! With the included remote control, scaffolding weighing up to...
- Scaffolding and Support Materials
Total supporter for construction sites! A wide range of offerings related to external/internal work, slopes, and suspended scaffolding, etc.
- Scaffolding and Support Materials
Thorough on-site management ensures daily safety! Rapid and reliable creation of temporary design plans using computer-aided design (CAD).
- Scaffolding and Support Materials
Example: Shizuoka Prefecture Commercial Facility New Construction (Ceiling Finishing Work) Moving scaffolding, which typically requires about four people, can be safely moved by one person!
- Scaffolding and Support Materials
Solving the need for large interior scaffolding while also considering the floor's load capacity! With the included remote control, it is possible to move scaffolding weighing up to approximately 3.5 ...
- Scaffolding and Support Materials
A proposal-type solution that shapes your ideas through consistent production. Leave the circular formwork, system formwork, and shoring plans to us.
- Steel
- Formwork material
- Scaffolding and Support Materials
Caissons, standing pillars, hollow bridge piers, etc.! Achieving construction without using separators.
- Formwork material
- Scaffolding and Support Materials
- others
The height and length of the workbench are both portable, with a maximum load capacity of 150 kg.
- Scaffolding and Support Materials
The unsung heroes essential for residential construction! Leave the scaffolding to us.
- Scaffolding and Support Materials
Four-legged adjustable slide scaffold platform (0.55–0.86m) Model number: M196WV-S086SAP
- Scaffolding and Support Materials
A wide range of products including paint, lacquer spray, caulking agents, adhesives, and more!
- Scaffolding and Support Materials
Four-legged adjustable slide scaffold platform (0.55–0.86m) Model number M196XP-S86AP
- Scaffolding and Support Materials