List of Construction Works products
- classification:Construction Works
6616~6660 item / All 12034 items
100% recycled gypsum derived from waste gypsum boards is reused as raw material, achieving effective carbon neutrality during manufacturing!
- Gypsum board and moldings
Developing equipment and technology for air conditioning, water supply and drainage, and kitchen drainage!
- Air conditioning equipment
- Water Treatment Plant
- Water supply facilities
Insulation Material Perfect Barrier Side Slit Type
- glue
- Insulation work
Insulation Material Perfect Barrier Standard Roll Type
- glass wool
- glue
- Insulation work
Introducing a pipe grounding method that is strong, lightweight, inexpensive, and environmentally friendly.
- Ground foundation construction method
- Other civil engineering works
- Pile and foundation work
Versatile steam polishing blast device capable of handling multiple applications.
- Concrete construction
- Renovation and repair methods
Since we will be bundling at the factory, on-site work can be significantly reduced!
- Steel bar construction
This is an introduction to a case study of an exterior store design where beautiful shadows stand out against the evening darkness, wrapped in plaster.
- Plaster wall
- Plastering and painting work
Unexpected heavy rain disasters due to flooding are occurring frequently. Let's protect your company from floods with lightweight aluminum alloy waterproof walls.
- Special function opening
- Dismantling and moving
- Roof and gutter construction
A sliding door made of natural wood type, using laminated natural wood, designed with consideration for children's safety.
- Interior/Interior Doors
- Wooden door
- Interior construction
A sheet-type sliding door that combines high safety developed for elderly care facilities with a cute design suitable for daycare centers and kindergartens.
- Interior/Interior Doors
- Wooden door
- Interior construction
Introducing the materials, tools, and work procedures used in the pipe earth method!
- Ground foundation construction method
- Other civil engineering works
- Pile and foundation work
Wipe off the oil stains with detergent and a cloth to eliminate the slipping of the hyper lift.
- maintenance
- Elevator installation work
- lift
We will clearly introduce the manufacturing methods, comparisons with conventional construction methods, and adoption results using photographs.
- Steel bar construction
- Special Construction Method
Perfect for raising awareness both inside and outside the factory! We introduce a sponge that highlights dangerous areas at construction sites and homes, ensuring safety. *Sample book available.
- Unit and other construction
- Safety and consumables
Environmentally friendly thin long polyurethane foam PureCell
This is a polyurethane that has weather resistance, heat resistance, hydrolysis resistance, and shock absorption properties, allowing it to be peeled off without leaving any adhesive residue and without the need for adhesive tape. PureCell is an environmentally friendly thin long polyurethane foam (UC) and thin long acrylic foam (AS) with an ultra-fine and uniform cell structure. The UC type has weather resistance, non-yellowing, hydrolysis resistance, and shock absorption properties, with a thickness ranging from 60μm to 1500μm, offering excellent thickness precision, making it suitable for a wide range of applications, particularly in the electronics field. The AS type has weather resistance, heat resistance, hydrolysis resistance, and shock absorption properties, and features self-tack, meaning it has self-adhesive properties. It is also characterized by being easy to peel off without leaving adhesive residue and does not require adhesive tape. High-tack types that can be applied to uneven surfaces such as wallpaper, as well as double-sided tack types, are also available.
Appreciation pond bottom drainage pit unit
- Water Treatment
- Unit and other construction
The door wire worn due to years of use has been replaced.
- maintenance
- Elevator installation work
- lift
Due to aging and deterioration over time, the main wire was replaced and oil was supplied to each rail.
- maintenance
- Elevator installation work
- lift
The button was unresponsive due to poor contact in the internal connection, so it was replaced.
- maintenance
- Elevator installation work
- lift
If you have any questions about lift and elevator renewal and maintenance, please feel free to contact us!
- maintenance
- Elevator installation work
- lift
The wire used for the outer door was broken, causing the door to become inoperable, so we replaced the wire rope.
- maintenance
- Elevator installation work
- lift
The door interlocking rope at the second-floor platform was broken, so we carried out the replacement work for the door interlocking rope.
- maintenance
- Elevator installation work
- lift
The operation has become smoother due to the replacement work of the basket guide shoe.
- maintenance
- Elevator installation work
- lift
We carried out the replacement work for the malfunctioning unloading port button.
- maintenance
- Elevator installation work
- lift
All the old door pulleys on the 1st, 2nd, and 3rd floors have been replaced.
- maintenance
- Elevator installation work
- lift
Due to aging deterioration from long-term use, all buttons of the dumbwaiter have been replaced.
- maintenance
- Elevator installation work
- lift
Complete removal and renewal from the elevator to a simple lift! Renovation work has been carried out.
- maintenance
- Elevator installation work
- lift
The unloading door rope was damaged and had a wire break, so it was replaced during the inspection.
- maintenance
- Elevator installation work
- lift
I replaced the basket door guide shoe and installed the door stopper rubber.
- maintenance
- Elevator installation work
- lift
The lever roller part of the limit switch has been replaced.
- maintenance
- Elevator installation work
- lift
Due to wire breakage occurring from usage methods, we replaced the wire rope for the door.
- maintenance
- Elevator installation work
- lift
The door wire of the simple lift that stops on the 1st and 2nd floors has been replaced.
- maintenance
- Elevator installation work
- lift
The intercom was replaced from the B1 floor to the 2nd floor due to a malfunction caused by aging deterioration.
- maintenance
- Elevator installation work
- lift
The boarding equipment was refurbished by using existing components and replacing the control methods.
- maintenance
- Elevator installation work
- lift
A dumbwaiter has been installed to transport food and drinks from the kitchen on the first floor to the dining area and banquet hall on the second floor.
- lift
- Small baggage lift
- Elevator installation work
A damper was installed using wedges to secure it to the wooden structure.
- lift
- Small baggage lift
- Elevator installation work
A compact dumbwaiter with dimensions of 870mm in width and 870mm in depth has been installed.
- lift
- Small baggage lift
- Elevator installation work
By being able to transport without using stairs, the burden on employees is reduced, and warm dishes can be delivered quickly.
- lift
- Small baggage lift
- Elevator installation work
Since it is locally assembled, basically no welding or similar work is required, and the installation work can be completed in one day!
- lift
- Small baggage lift
- Elevator installation work
A new dumbwaiter has been installed to transport food and drinks from the kitchen on the first floor to the dining area on the second floor.
- lift
- Small baggage lift
- Elevator installation work
We have newly installed a small freight elevator by utilizing the opening created for the installation of the stairs as is.
- lift
- Small baggage lift
- Elevator installation work
Space-saving design! A compact dumbwaiter has been installed in the newly opened izakaya.
- lift
- Small baggage lift
- Elevator installation work
Installed a stainless steel dumbwaiter! It is resistant to water and heat, making it ideal for transporting food.
- lift
- Small baggage lift
- Elevator installation work
After completely removing the noisy and unused freight lift, a new dumbwaiter was installed.
- lift
- Small baggage lift
- Elevator installation work
The integrated exterior design eliminates the need for shaft construction! If you create openings on each floor, installation can be completed in just one day.
- lift
- Small baggage lift
- Elevator installation work
The inside of the basket is divided into three sections with removable dividers! The height of each section is approximately 20 cm.
- lift
- Small baggage lift
- Elevator installation work