List of Heating and Cooling Systems products

  • classification:Heating and Cooling Systems

721~765 item / All 1350 items

Displayed results

World's first!! Water storage heating floor system.

  • Floor heating (electric, panel, storage type, etc.)
  • Floor heating system
  • Other construction services

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Two powerful cool breezes blow away the scorching heat! For heatstroke prevention and ventilation measures on-site!

  • Cooling system
  • Heating and cooling equipment and facilities

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
1.jpg

Portable spot coolers for heatstroke prevention in factories, warehouses, gyms, etc.!

July is just around the corner, and summer is in full swing! How are you implementing heatstroke prevention measures in facilities and manufacturing sites without air conditioning during this season? At JALOC, our rental spot coolers, the "Cool Series," which are available only during the summer, are very popular! What do you think? By creating a cooler work environment, you can also expect an increase in worker productivity. Please consider this for heatstroke prevention in factories, warehouses, gyms, and more!

By reviewing and maintaining rooftop ventilation fans and roof fans, it is possible to ventilate the entire space!

  • Heating and cooling equipment and facilities
  • Air conditioning equipment
  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Ventilation is essential when considering heat countermeasures in warehouses and factories! Examples of ventilation in logistics warehouses.

  • Heating and cooling equipment and facilities
  • Air conditioning equipment
  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Decarbonization] An eco-friendly large-capacity air conditioning system utilizing groundwater for outdoor air intake! Effectively cools large spaces such as factories by harnessing new renewable ener...

  • Air conditioning
  • Heating and cooling equipment and facilities
  • Ventilation and smoke exhaust equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Creating a comfortable environment by circulating air! A case of replacement work due to aging.

  • Heating and cooling equipment and facilities
  • Air conditioning equipment
  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The installation is in one location in the attic! Electronic whole-house air purification unit exclusively for OMX/Passiv Aircon.

  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
2d8a5897-b63a-46fa-3fbd-9c9078647e47.png

I started a YouTube channel called "Building a House I'm Glad I Built"!

The first thing to worry about when building a house is choosing a construction company. For those considering building a house, we want you to meet a construction company that suits you! That's why we started the YouTube channel "Tate te Yokatta Ie Zukuri Channel," commonly known as "Tate Yoka Channel"! On this YouTube channel, we will be updating weekly live videos of room tours from OM member construction companies across the country. In the future, we will be releasing various videos, so please don't miss out! We also ask that you subscribe to our channel! We are also in the process of creating a website that clearly introduces the houses featured in the videos and the construction companies that built them, so please look forward to it.

Proposing mist systems suitable for the site. Addressing diverse needs such as outdoor use, local cooling, and extensive cooling.

  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Temperature control and humidity management are possible! It is expected to lower the temperature in the spraying area by approximately 2 to 4°C.

  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Direct water supply from the water supply system is possible, allowing for detailed mist to be sprayed over a wide area! The color of the tank can be repainted according to your request.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Virus removal! A mist shower device that performs full-body disinfection and cleaning through the spraying of disinfectant water.

  • others
  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Combining the fan function's wind speed with fine mist cooling to achieve effective cooling! Heat countermeasures in summer and static electricity countermeasures in winter!

  • Air conditioning equipment
  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Equipped with a remaining amount gauge! A cooling device that utilizes evaporative heat to spray fine mist carried by the fan's wind.

  • Mist Generator
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The construction is simple and easy! An energy-saving cooling device that utilizes fine mist vaporized in the atmosphere.

  • Heating and cooling equipment and facilities
  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

The moisture of ultra-fine mist and the aroma that spreads instantly! It heals both the body and the mind!

  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Moisturizing effect of ultra-fine mist. Large capacity 20L tank, equipped with UV sterilization lamp!

  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Floor heating that achieves warmth like a sunny spot!

  • Floor heating (electric, panel, storage type, etc.)
  • Floor heating system
  • Flooring materials compatible with underfloor heating

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

A 24-hour ventilation system that utilizes the moisture absorption and desorption action of desiccants (drying agents) for dehumidification and humidification.

  • Ventilation system
  • Ventilation and smoke exhaust equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Are you maintaining the air conditioner? A clean air conditioner can also help attract customers.

  • cleaning
  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Protects dry skin from irritation with a ceramic speed hot air and ultrasonic humidifying mist!

  • Mist Generator

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Spray mist on the areas of concern! It can be charged and used with a battery, making it portable for various locations.

  • Mist Generator
  • Sanitary fixtures

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Contributing to a comfortable classroom environment! Ventilation fan controller 'ARU-03C/ARU-05C' equipped with a CO2 sensor.

  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

No ventilation equipment is needed, and installation is easy! A wide range of bioethanol fireplaces is available.

  • fireplace

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Powerful airflow with a wingless air duct structure, equipped with a three-layer filter for sterilization.

  • Cooling system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Significantly speed up construction! Easy 3-step installation! Compatible with 9.5mm and 12.5mm gypsum boards with just one tool!

  • Air conditioning
  • stone

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Garden Products Sky Shade

  • Garden stones, sculptures, fountains, ponds
  • Air conditioning
  • stone

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

We will introduce a case where the high-altitude work site, which had a harsh environment due to extreme heat, was resolved using a spot bazooka!

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 094901.png

[Heatstroke Prevention Case Study] Sumitomo Heavy Industries Modern, Ltd.

At Sumitomo Heavy Industries Modern Co., Ltd., a factory that manufactures large machines of various sizes and shapes, the indoor environment is air-conditioned, but the height of the building is very tall. During the summer, when assembling large machines, the temperature in high places is high, and there was a need to improve the working environment. Therefore, I learned that EASE offers a rental of a demo unit for the "Spot Bazooka Integrated Set" and consulted with them. They connected a duct to change the blowing direction of the demo unit to check its effectiveness. When air was blown at an upward angle to the high work area, we confirmed that cold air reached the area, and we decided to implement it. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Client: Sumitomo Heavy Industries Modern Co., Ltd. (Futtsu City, Chiba Prefecture) ■ Implemented Products: Four units of "Spot Bazooka Integrated Set" (350φ reducer + flexible duct)

For gymnasiums where regular air conditioning installation is not possible, "Spot Bazooka" is the solution! Introduction of case studies.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
image_10.png

[Heat Stroke Prevention Case Study] Chikushi Jogakuen University

Here is an introduction to the case of Chikushi Jogakuen University, which implemented measures against heat stroke for classes and club activities. Due to the aging of the gymnasium, the university had previously been unable to install conventional air conditioning. However, with the installation of "Spot Bazooka," they were able to conduct physical education classes and club activities without worrying about heat stroke, creating a comfortable environment. Additionally, a safety net was installed as a precaution, ensuring safe use by preventing fingers from getting caught. The drainage of condensate water is managed with a tank. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Location: Chikushi Jogakuen University, Fukuoka Prefecture ■ Number of units installed: 4 integrated units ■ Installation period: July 2020

Decision to add more units! A case that received great acclaim for having such a large airflow spot air conditioner.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 095729.png

[Heat Stroke Prevention Case Study] Hyogo Prefecture, Pharmaceutical Manufacturing Plant

At a pharmaceutical manufacturing plant in Hyogo Prefecture, during the summer before the introduction of the "Spot Bazooka," the temperature inside the semi-open factory exceeded 35 degrees Celsius, making work very difficult. Therefore, this product was introduced. Since liquids are being handled, the humidity inside the factory was also high, creating a harsh environment with a significant risk of heatstroke. However, after the introduction, workers were able to feel dry, cool air in the work area, and it has received very positive feedback from employees. For more details, please refer to the related products and catalog. [Introduction Overview] ■ Location: Pharmaceutical manufacturing plant in Hyogo Prefecture ■ Number of Spot Bazookas installed - Single type: 11 units - Twin type: 2 units - Integrated type: 1 unit ■ Introduction period: 2017

Introduced as a measure against heatstroke in summer! A case where the decision to implement was made due to the short installation period and cost-effectiveness.

  • Air conditioning
  • Air conditioning equipment

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 101155.png

[Heat Stroke Prevention Case Study] Kasamatsu Town Matsue Elementary School

We would like to introduce the case of Matsue Elementary School in Kasamatsu Town, which implemented measures against heat stroke for classes and club activities. There are three elementary schools and one junior high school in the town, and air conditioning facilities in classrooms were established early on. However, two of the elementary schools did not have air conditioning in their gymnasiums. As a result, we arrived at the 'Spot Bazooka,' which was suitable in terms of overwhelming airflow effectiveness, safety, installation space, and cost. After confirming the installation site and conducting a demonstration, we verified its effectiveness and implemented it in both schools. As a result, we have received feedback that not only the schools but also the local sports activities through school openings are now able to operate comfortably. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Installation Location: Matsue Elementary School, Kasamatsu Town, Hatori District, Gifu Prefecture ■ Number of Units Installed: 6 units of Spot Bazooka Single Type ■ Implementation Period: May 2020

After implementation, it has received great acclaim for enabling comfortable and agile activities! Here is an introduction to a case where it was introduced as a heatstroke prevention measure during t...

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 101713.png

[Heat Stroke Prevention Case Study] Saitama Prefecture Disaster Prevention Aviation Center

This is an introduction to the case study implemented at the Saitama Prefectural Disaster Prevention Aviation Center. The Saitama Prefectural Disaster Prevention Aviation Team conducts aerial firefighting and rescue emergency activities using helicopters. This time, we introduced the "Spot Bazooka" as a measure against heatstroke during the team's rigorous training. Until now, training inside the helicopter hangar was conducted in a very harsh environment without air conditioning, but after the introduction, the team members have been able to operate comfortably and efficiently, receiving great praise from the members. For more details, please refer to the related products and catalog. [Overview] ■ Issues - Training inside the helicopter hangar was conducted in a very harsh environment without air conditioning. ■ Effects - After the introduction, team members have been able to operate comfortably and efficiently, receiving great praise.

Since there are no vinyl ducts, it won't interfere with the work! Introduction of a case where approximately 117 units were installed in 7 locations.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102024.png

[Heat Stroke Prevention Case Study] Home Logistics Co., Ltd.

The warehouse of Home Logistics Co., Ltd. has a floor height of just under 10 meters, and cooling the entire building would incur tremendous costs. However, if left unattended, the environment can exceed 35°C in the peak summer, posing a constant risk of heatstroke. Therefore, we introduced the air conditioner 'Guppy Bazooka,' which is used in agricultural greenhouses. It delivers powerful cold air up to 50 meters away with its large airflow and static pressure (the force of pushing air). We first tried one unit, and it indeed delivered cold air up to 50 meters. Next, we purchased four more units, and the workers rated it as "excellent." As a result, approximately 117 units were installed in seven logistics warehouses (DCs) across various regions of Home Logistics. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Issues - Cooling the entire warehouse would incur tremendous costs. - The environment can exceed 35°C in the peak summer if left unattended. ■ Effects - Powerful cold air reaches up to 50 meters away with large airflow and static pressure (the force of pushing air). - There are no vinyl ducts, so it does not interfere with work.

It was found that it can be implemented at a cost of less than one-fifth of the conventional equipment costs, and the decision to implement it was made!

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102258.png

[Heat Stroke Prevention Case Study] Bunkyo Gakuin University Girls' Junior High School and High School

Among the three gymnasiums in total, the main gymnasium of the academic building, which did not have air conditioning installed, had previously considered the introduction of air conditioning, but the costs were too high, leading to the plan being put on hold. However, upon learning about our products, they decided to reconsider the installation. In the case of the "Spot Bazooka," it was found that it could be installed for less than one-fifth of the cost of conventional equipment, leading to the decision to proceed with the installation. As a result, during the summer before installation, the temperature inside the gymnasium exceeded 30 degrees Celsius, making classes and club activities difficult due to the heat. After installation, the environment became very cool and comfortable. For more details, please refer to the related products and catalog. 【Case Overview】 ■ Installed Equipment: Gupii Bazooka Single Type x 4 units ■ Capacity: Maximum 7 horsepower (28 horsepower for 4 units) ■ External Dimensions & Weight ・Indoor Unit: Height 920mm x Width 950mm x Depth 330mm, 52kg ・Outdoor Unit: Height 1350mm x Width 950mm x Depth 330mm, 90kg

The indoor unit uses a casing equivalent to the outdoor unit, allowing for outdoor installation! Introduction of case studies for the Spot Bazooka.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102500.png

[Heat Stroke Prevention Case Study] Koshigaya Chemical Industry Co., Ltd.

Koshigaya Kasei Kogyo Co., Ltd. has been struggling with heatstroke measures for employees every year, as the temperature inside the factory exceeds 35 degrees in summer. However, we found the powerful spot air conditioner "Spot Bazooka" on the website. Immediately (in mid-July 2018), we borrowed a demo unit for one week and tested it in the extreme heat of the factory. The cool, dry air reached far and was very well received by the employees, leading us to decide to implement it. By attaching a flexible duct of the same size as the indoor unit's blower, duct resistance was reduced, allowing a large volume of cool air to be supplied throughout the factory, and the direction of the airflow could be easily changed. For more details, please refer to the related products and catalog. [Implementation Overview] ■ Challenges - The temperature inside the factory exceeds 35 degrees in summer, causing annual concerns about heatstroke measures for employees. ■ Effects - The cool, dry air reached far and was very well received by the employees.

Evaluation that 'it was good to be able to install it quickly!' Introduction of cases where it has been implemented mainly in elementary and junior high schools.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102714.png

[Heat Stroke Prevention Case Study] 19 Elementary and Junior High School Gymnasiums in Nakano Ward, Tokyo

In Nakano Ward, we have introduced spot bazookas, focusing on the elementary and junior high schools that are planned for renovation in the future. Although there are plans for future renovations, we have implemented the introduction with a budget constraint of three units per school, and the schools that have actually used them have expressed their happiness, saying, "It's very cool." Since it is a lease introduction, the spot bazookas have a short installation period from planning to setup (possible within a year), and the representatives from Nakano Ward have also evaluated it positively, stating, "It was good that we could install it quickly." Additionally, the indoor and outdoor units are compact, making relocation easy. In Nakano Ward, they plan to relocate them before the start of renovation work at the elementary and junior high schools to make effective use of the leased equipment. For more details, please refer to the related products and catalog. 【Introduction Overview】 ■ Nakano Ward Saginomiya Elementary School Gymnasium Indoor Unit ■ Nakano Ward Saginomiya Elementary School Gymnasium Outdoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Indoor Unit ■ Nakano Ward Eighth Junior High School Gymnasium Outdoor Unit

Cooling only the workspace! Introduction of a case study that significantly reduced air conditioning installation costs.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 102859.png

[Heat Stroke Prevention Case Study] Shinkokyo Co., Ltd.

Shinchu Kogyo has been considering measures against heatstroke at their automobile maintenance facility for some time. During their consideration of air conditioning systems due to the relocation of their headquarters, they learned about the existence of the Spot Bazooka at an exhibition. It became clear that the Spot Bazooka, which blows cool air only to the work area (where needed), significantly reduces initial costs compared to installing a conventional air conditioning system. Furthermore, due to the nature of the maintenance facility, dust is a concern. The Spot Bazooka's environmental resistance, allowing for outdoor use while being easy to maintain, was a decisive factor in its adoption. For more details, please refer to the related products and catalog. [After Implementation] ■ Significantly reduced initial costs ■ Environmental resistance for outdoor use ■ Easy maintenance ■ The cooling air reached over 10 meters even in the semi-open maintenance facility where outside air enters, allowing workers to perform maintenance comfortably ■ Improved work efficiency

The key point is that the air conditioning's cooling airflow reaches far with a large volume of air! Introduction of case studies from vehicle maintenance facilities.

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 103040.png

[Heat Stroke Prevention Case Study] Vehicle Maintenance Facility

This is an introduction to a case where a vehicle maintenance facility was implemented. The work inside the vehicle maintenance facility was conducted without air conditioning, but due to the continuing extreme heat during the summer years, we were considering measures against heatstroke. Therefore, we installed one unit of a spot bazooka integrated type in the vehicle maintenance lane, which is the work flow, and also installed two units of the spot bazooka integrated type on the opposite side. We considered various products, but decided on Ease's spot bazooka after experiencing the actual machine at an exhibition. The deciding factor was that the large airflow allowed the air conditioning's cooling breeze to reach far away, and after installation, the dehumidified dry air reached us, drying our sweat and creating a comfortable environment. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ Delivery Location: Koto Ward, Tokyo, Vehicle Maintenance Facility ■ Number of Units Installed: 7 Spot Bazooka Integrated Types ■ Installation Period: July 2020

Introducing a case study of the Spot Bazooka, which can blow cool air about 20 meters even inside semi-open buildings!

  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration
スクリーンショット 2021-06-21 103728.png

[Heat Stroke Prevention Case Study] Hanwa Co., Ltd.

At the factory of Sanko Kogyo Co., Ltd., measures against heat have been implemented so far, such as the installation of fans, provision of cooling vests, and taking breaks during work when the WBGT warning temperature is reached. However, in order to further improve the workplace environment and ensure the safety of workers, we have decided to implement more advanced measures at all sites. We are introducing our highly efficient air conditioning units at locations nationwide. In selecting the air conditioning units, the 'Spot Bazooka,' which can blow cool air approximately 20 meters even in semi-open buildings, emerged as a strong candidate. This decision was made based on performance verification through demo units and confirmation of implementation results in the market. For more details, please refer to the related products and catalog. 【Implementation Overview】 ■ A total of 99 Spot Bazookas have been installed at 20 locations nationwide (18 sales offices, including group companies, and 2 factories) as of the end of 2020.  * Breakdown: 15 integrated units, 84 separate units (single type).

Reduce CO2 emissions and consider the environment! It has low flammability, ensuring safety and comfort that lasts.

  • Stove

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

I want to make the ordinary days of life richer and warmer. It is from this desire that I created this stove.

  • Stove

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

I want to warm the space like the sunlight streaming in through the window. That's why I named it "Hinata." Maximum heating capacity: 50 tatami mats.

  • Stove

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

- Nationwide support with forced ventilation fans! We handle roof fans, forced ventilation, ventilators, factory ventilation fans, and more. *Replacement and repair services are also available.

  • Ventilation system

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Strong and resistant to rust! A proud outdoor and indoor rack with robust body construction.

  • Air conditioning
  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Compact, high performance, and high quality.

  • Air conditioning equipment
  • Air conditioning

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

Filter

classification
Delivery Time
Location