List of Civil Engineering products
- classification:Civil Engineering
1171~1215 item / All 7976 items
Introducing examples of handrail production that ensures safety with appropriate costs and short delivery times!
- handrail
Clear visibility with transparent glass! Recommended for store and building entrances.
- Disaster prevention fittings
- Entrance/Exterior Doors
A case study of correcting liquefied ground due to the earthquake! Maximum settlement of about 60mm was corrected in a day and a half.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum settlement of 500mm occurred! A case where the up-con method and single pipe pile driving method were used in combination for correction.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Possible to carry out construction without moving! Introducing a case where a settlement of up to 107mm was quickly corrected.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
A maximum subsidence of 48mm occurred due to ground subsidence! Here we present a case of correcting subsidence within a short construction period of two days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Even if the space between neighboring properties is very narrow, construction is possible! A maximum settlement of 66mm can be corrected in 3 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Disaster recovery and emergency response for roads! 100% filling of gaps and voids with polyurethane resin.
- Renovation and repair methods
- Ground foundation construction method
- Road construction
An example of quickly correcting the unevenness in the concrete pavement slab of a highway toll booth!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Performed correction of the toll booth subsidence! Partial corrections were also carried out in areas where there was a step difference with the U-shaped drainage ditch.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Plant vehicles deployed inside the toll booth! A case of correcting the unevenness of the CO pavement slab inside the toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Conducted resin injection work while managing levels! A case completed in 4 days.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Repairing the apron step and gaps without removing the apron! A case where our method was adopted.
- Renovation and repair methods
- Airport facilities
- Ground foundation construction method
Correction of road surface irregularities in a short construction period! Introducing examples of port facility repair work.
- Renovation and repair methods
- Harbor Construction
- Ground foundation construction method
Maximum settlement of about 80mm due to earthquake and liquefaction! A case corrected in a short construction period of 2 days.
- Renovation and repair methods
- Residential foundations
- Ground foundation construction method
Our method, which raises the CO pavement slab using the foaming pressure of rigid urethane resin, has been adopted!
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Construction period is 1 day! A case study of the correction work for the sinking of the platform section inside the toll booth conducted in Saitama Prefecture in December 2012.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
Settlement correction while checking the level! A case of pavement repair work at the entrance of a toll booth.
- Renovation and repair methods
- Road construction
- Ground foundation construction method
We will realize a power supply with benefits that everyone can choose.
- Power generation facilities
Improving reliability in low concentration areas! Energy-saving design with a safe waterproof structure!
- Airport facilities
To interchanges and smart interchanges! Efficient and low-cost snow melting with far-infrared rays.
- Snow melting equipment
- Exterior snow melting equipment
Easy setup! Prevents disruptions to ETC lane equipment caused by snowfall.
- Snow melting equipment
- Exterior snow melting equipment
For ensuring safety! It is very effective as a snow prevention measure at tunnel entrances.
- Snow melting equipment
- Exterior snow melting equipment
For snow accumulation and freezing prevention! It can be installed in a short period without road construction.
- Snow melting equipment
- Exterior snow melting equipment
For cost reduction! Snow melting through autonomous driving is possible, preventing the premature shutdown of ETC equipment.
- Snow melting equipment
- Exterior snow melting equipment
Since it is composed only of asphalt and special aggregates, it can be cut together with asphalt mixtures during repair work and can be used directly as recycled aggregates!
- Paving of sidewalks, roads, parking lots and stadiums
With one-third the weight of concrete blocks, it can be easily installed on balconies and rooftops! It is maintenance-free, resistant to scratches and dirt, and maintains a beautiful appearance.
- Paving of sidewalks, roads, parking lots and stadiums
Achieving a stable supply of high-quality rubber powder through domestic plant production!
- Paving of sidewalks, roads, parking lots and stadiums
Achieving a stable supply of high-quality rubber powder!
- Paving of sidewalks, roads, parking lots and stadiums
Continental Contitech's industrial hoses cater to a wide range of industries.
- Pipeline Construction
We receive requests because it can be constructed in a short period of time! Using urethane for subsidence correction.
- Ground improvement
We have experience in construction projects such as measures against the aging of elementary school buildings and the construction of warehouses!
- Pavement construction
- Sewerage facilities
Decomposing and harmlessly treating difficult-to-decompose organic substances! We propose treatment methods tailored to the composition of wastewater.
- Water treatment technology and systems
- Drainage and water removal
- Water Treatment
Active in explosion-proof areas of chemical plants with air-powered tools! Torque range from 135Nm to 3600Nm, high-speed large bolt tightening.
- Work tools
- Power generation facilities
- Equipment leasing and rental
An anti-adhesion agent for asphalt proposed by Takenaka Sangyo, which is well-versed in asphalt mixtures!
- Road construction
The authentic baseboard has a new beige color. Long-standing dirt stains are less noticeable. Its high visibility allows for safe use and helps prevent forgetting to remove it.
- Paving of sidewalks, roads, parking lots and stadiums
- Temporary Construction
- Temporary Construction Materials
Non-slip and improved visibility in places where durability is required! Completely maintenance-free after installation.
- Paving of sidewalks, roads, parking lots and stadiums
- Subsidiary materials