List of Civil Engineering products
- classification:Civil Engineering
7696~7710 item / All 8025 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Noise and safety-focused method
- Dam construction
- Rock drills, demolition machines, and excavators
Breaking away from on-site casting!
- Dam construction
- Prefab
- Prefabricated Concrete Products
Natural Restoration Method: Relocation of the Forest
- Earthworks
- Pile and foundation work
Forest Topsoil Utilization Worker A0 Base Method
- Retaining wall
- Earthworks
- Pile and foundation work
Core drilling method
- Other civil engineering works
- Waterproofing work
Because it's electric, it's safe, quiet, and clean! "Hotoke-ru" supports a comfortable winter life.
- Snow melting equipment
- Exterior snow melting equipment
Liquid moisture-retaining agent that provides "moisture" to the soil.
- Earthworks
- Pile and foundation work
- Planting work
Restoration of a lush green environment.
- Landscaping materials
- Other civil engineering works
- Earthworks
Temporary scaffolding work is necessary when the height exceeds 2 meters to maintain safety and construction quality.
- Temporary Construction Materials
- Dam construction
- Temporary Construction
Contribute to the Earth's environment 100 years from now.
- Ready-mix concrete
- Dismantling and moving
- stone
Large Easy Mesh Basket
- Retaining wall
- Earthworks
- Pile and foundation work
Water-retaining soil greening substrate Eco Breath Green
- Tunnel construction
Automatic rising and falling gate, rear push-up type.
- Hoist/Crane
- Airport facilities
- Steel construction
Panel-type protective fence for restoration work
- Protective fence
- Dam construction