List of Construction, work and methods products
- classification:Construction, work and methods
361~405 item / All 27346 items
You can install scaffolding on the float! Enjoy the water space freely! Information on floating dock rentals.
- Bridge Materials
Just by "applying" it to metals, glass, concrete, etc., you can achieve high durability waterproofing and repairs! It can be painted over.
- Waterproof tape, adhesive, drain, protective panel
We will introduce examples of road design using geotextiles that have become possible in weak subgrade ground!
- Ground foundation construction method
A case where we proposed an alternative method for cast-in-place concrete in the presence of spring water!
- Formwork material
- Other civil engineering works
We propose a method for reinforcing river levees as a crisis management hard measure! Case study from Typhoon No. 19.
- Slope protection material
- River construction
By laying geotextile sheets on weak ground, it is possible to protect vehicle passage and the leased land!
- Ground foundation construction method
We propose strengthening river levees based on the vision for reconstructing a society with water disaster prevention awareness!
- River construction
- Earth retaining wall/foundation reinforcement
This is a construction method suitable for temporary closures associated with the reinforcement of movable weirs that can adjust water levels and flow rates!
- Special Construction Method

[NETIS Registration] Cost Reduction and Environmental Consideration with "Temporary Closure Waterproof Sheet Method" / Azai Technical Consultant Co., Ltd.
Cost reduction, resource conservation, labor saving, quality improvement, and environmentally friendly construction methods! We offer design cooperation! Our company handles the temporary closure method using "float-type platforms/waterproof sheets with waterproof fasteners." The "float-type platform" is designed with a sliding function to allow the installation of a platform necessary for assembly work around bridge piers in minimal space. Additionally, by adopting waterproof sheets, we have eliminated the need for water stop packing that was previously used during the assembly of temporary closure materials, enabling water stopping with the waterproof sheets. 【Features】 <Float-type Platform> ■ Installed around bridge piers with the minimum space required for assembling temporary closure frames. ■ By incorporating sliding functions at four points on the circular platform, it allows for expansion and contraction without separating the platform. ■ By installing multiple spacers on the sides of existing bridge piers, it suppresses the swaying of the platform. ■ Reduces the time required for the installation and removal of the platform. *For more details, please download the PDF or feel free to contact us.
Free from frequent cleaning of the intake! A water screen suitable for the intake of drinking water supply facilities.
- Other civil engineering works
A case of renovating a condominium rooftop with PVC sheet waterproofing. It offers excellent weather resistance and durability, achieving long-lasting waterproofing! Solar panel installation on flat r...
- Waterproof sheet
- Waterproofing work
- Roof and gutter construction
Does not damage the waterproof layer! Lightweight at approximately 4kg/m2! This is a 'foundation for solar module installation on flat roofs' that accommodates various conditions.
- Solar power generation equipment
- Solar mounting brackets and fittings (solar fittings and protective sheets)
- Waterproofing work
Management of ultraviolet (UV) intensity and cumulative light amount
- Housing structure technology/long-term superior housing technology
陸屋根・S造デッキプレート下地で太陽光パネル設置が可能!軽量&防水材一体型太陽光架台基礎「連結ディスクADC」
- Solar mounting brackets and fittings (solar fittings and protective sheets)
- Solar power generation equipment
- Waterproofing work
Lightweight enough to be held with one hand (10kg/5m²), and no special vehicles or tools are needed! Just hammer in the dedicated nails! Anyone can do it.
- Gutters and U-shaped gutters
- Slope protection material
- Renovation and repair methods
Protecting people and the grass from the heat!
- Air compressors, blowers and pumps
Blowing away the heat with astonishing wind speed!
- Air compressors, blowers and pumps
Achieving versatile floor polishing with 100V.
- Renovation and repair methods
- Plastering and painting work
- Waterproofing work
High-reflective PVC sheet waterproofing reflects infrared rays, suppresses radiant heat, and achieves energy-saving effects!
- Waterproof sheet
- Waterproofing work
- Heat-insulating and moisture-permeable roofing
"Rivet Roof Waterproofing System" is a PVC sheet waterproofing material that accommodates various shapes and materials of roofs.
- Roof and gutter construction
- Others/Roofing materials (shingles, cement, steel sheets, aluminum)
- Waterproofing work
Centralized management of weather forecast information for the site and upstream rivers in the cloud, with automatic notifications via electronic bulletin boards and business chat during emergencies.
- River construction
- Weather Survey
Visualization of strong winds in construction work!
- Weather Survey
- Crane and others
Examples of using weather-resistant large soil bags, fabric formwork for fab reform, and site stabilization work with a comeback!
- Other civil engineering works
Proposal for disaster recovery methods for riverbank protection in earthquake damage!
- Other civil engineering works
Introducing examples of using friction cutter functional coatings!
- Bridge Construction
- Ground foundation construction method
Construction possible using mattress method on weak ground where concrete structures cannot be installed!
- Ground foundation construction method
Construction is possible using the GeoWeb mattress method on weak ground where concrete structures cannot be installed!
- Ground foundation construction method
Introducing examples of accident prevention measures for water surface drop incidents in pond bank protection works!
- Other civil engineering works
The disaster prevention steps can be installed at any position in a vertical arrangement, just like stair construction!
- Other civil engineering works
Environmentally focused legal face protection work using a special fabric formwork made from high-strength synthetic fibers combined with planting technology!
- Other civil engineering works
The Volclay mat method can be used for pond renovations aimed at improving seismic resistance through leak prevention!
- Other earthworks, foundation works, and exterior floors
Low-cost implementation of sand mat construction alternatives! Simple preliminary design considerations can be made.
- Ground foundation construction method
Cracks appeared on the embankment road surface immediately after pulling out the soil anchor! Introducing the causes and proposed countermeasures.
- Piles, caissons, sheet piles
- Ground foundation construction method
Learning from cases where steel arrows could not be removed: estimated causes and proposed countermeasures!
- Piles, caissons, sheet piles
- Ground foundation construction method
Discovered during inspection after the pull-out of the arrow board! Introducing the estimated causes and proposed countermeasure methods.
- Ground foundation construction method
- Bridge Construction
- Piles, caissons, sheet piles
Short fiber non-woven fabric is unsuitable as a sand prevention sheet used for harbor applications!
- Coastal construction
- Ground foundation construction method
Centralized management of on-site sea condition forecasts, weather observation information, and camera footage! Achieving weather digital transformation using ICT!
- Other civil engineering works
- Coastal construction
- Harbor Construction

[Compass PLUS Implementation Case] Hokuriku Regional Development Bureau - Coastal Beach Nourishment Project: Centralized management of sea condition forecasts, weather observation information, and camera footage on-site! Achieving weather digital transformation (DX) using ICT!
We will introduce a case study of the 【Compass PLUS】 (NETIS registration number QSK-210001-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Field Challenges: Key Points of Evaluation 【Operating Environment】 Install 【N Sensors】 and 【Web Cameras】 on-site to check the sea condition forecasts and weather observation information along with the camera footage within 【Compass PLUS】. Additionally, install a 【Disaster Prevention Light】 above the office to share information with workers on-site. 【Purpose of Implementation】 〇 Understanding weather and sea conditions is essential for construction near the coast. 〇 It allows viewing sea condition forecast information, weather observation information, and camera footage on the same site. 〇 The 【Disaster Prevention Light】 raises awareness of weather disaster prevention among on-site workers. 〇 When adverse weather prevents access to the site, use the 【Web Camera】 to remotely check the site conditions. ■ Proposal (Example) For more details, please download the PDF.
Visualizing coastal gusts: Constantly illuminated three-color indicator lights for quick assessment of work feasibility.
- Anemometer
- Weather Survey
- Coastal construction

[ZEROSAI Implementation Case] Regional Development Bureau National Route No. 〇 Road Improvement Project
We will introduce examples of the implementation of the Natural Disaster Prevention System ZEROSAI (Registration Number QS-150021-VE) in civil engineering and construction work in the construction industry. It can be utilized not only for safety measures but also for creative ideas and technical proposals. [Before Implementation] Due to the proximity of the sea and the lack of obstructions, there were many sudden gusts of wind, making it difficult to determine whether it was safe to continue work. <Issues> - Checking weather apps for work decisions took time, and there was a time lag in informing the entire site. - Delays in deciding to halt work due to strong winds led to cases where work continued while risks were present. We introduced our Natural Disaster Prevention System ZEROSAI along with the optional three-color signal light. For more details, please visit our website or download the PDF.
Utilization plan for technical proposals: Rainfall measures in dam construction.
- Dam construction
Quality control of concrete based on weather forecasts! View linear precipitation zones and typhoon information together! Achieving weather digital transformation using ICT!
- Other civil engineering works
- Road construction

【ZEROSAI Case Study】NEXCO Concrete Structure Repair Work Quality Control of Concrete Based on Weather Forecasts! View Linear Precipitation Zones and Typhoon Information Together! Achieving Weather DX with ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - Quality control of concrete is necessary. - Along with temperature management, rainfall prediction and observation are conducted for the management of the concrete pouring process. - Measures need to be taken against sudden strong winds. - Notifications should be sent via LINEWORKS when the standard values are exceeded. ■ Proposal (Example) For details, please download the PDF.