List of Construction, work and methods products
- classification:Construction, work and methods
6076~6120 item / All 27338 items
Easily connect pipes with different outer diameters! A fitting suitable for emergency repairs of buried pipes.
- others
Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!
- Renovation and repair methods
Using high-strength urethane resin, we will correct the deformations such as subsidence, steps, flapping, gaps, and cavities that have occurred in the concrete slab, without excavation and within a sh...
- Renovation and repair methods
Due to being leaderless, the work area is easy to define, making it useful even in narrow sites! Maintenance is also easy because a power shovel is being used!
- Foundation construction machinery
Covers millimeter waves across a wide frequency range from 300MHz to 87GHz with eight models. High reception sensitivity of -125dBm captures weak signals.
- Environmental Survey
- Other measuring instruments
- Airport facilities
A wireless alarm system that is easy to install for safety management at construction sites and issuing warnings to local residents!
- Other civil engineering works
Just by walking while pushing, it easily absorbs water from the wet surface! Can be stored compactly.
- Drainage and water removal
- Other earthworks, foundation works, and exterior floors
A leak repair method that excels in waterproofing, durability, and workability. Compared to complete replacement, it only requires sealing materials, making the installation easier.
- Renovation and repair methods
Solar power generation reverse flow prevention, 12A, compatible with 1,000Vdc, 100 hours salt spray test passed, IP67.
- Water and sewerage pipe fittings
- Waterproofing work
- Power distribution and control panels

88MW and 92MW anti-backflow diodes for floating solar power.
A reverse current blocking diode is used in water-based solar power generation and can provide current output to partially damaged strings.
Do you have concerns such as 'the belt is breaking' or 'the startup sound is loud'? Gradually start the machine, eliminate shocks, and keep the noise quiet!
- Air compressors, blowers and pumps
No initial investment is required, and water bills can be reduced! By drilling a well, a secondary water source can be secured.
- Water Supply Facilities
- Wells and hot springs
- Water Treatment Plant
We can provide a comprehensive service from the design of reflective umbrellas for various optical equipment products to mold creation.
- Special Construction Method
It is ideal for making temporary sidewalks at construction sites barrier-free.
- Road construction
- Temporary Construction Materials
Explosion-proof electric vacuum cleaner HEPA (Zone 21) Model number M2727XP1-54W-HEPA
- Sweeping vehicles, grass cutting vehicles, road surface regeneration machines, snow removal machines
No need for temporary anchoring work! Introducing the mechanism of "Anchor Tamer," which combines both "spacer function" and "stopper function."
- Special Construction Method
Prevent root upturning with the root-stopping sheet, guiding roots to a pressure-resistant base! It helps the growth of trees.
- Pavement construction
Strong and elegant! Jakago method using the highest quality zinc-coated iron wire with aluminum.
- Renovation and repair methods
We will calculate the intersection point between the pile and the supporting ground surface to determine the elevation of the intersection point.
- Piles, caissons, sheet piles
- Other Software
Non-destructive detection of rebar fractures in reinforced concrete poles such as telecommunication and traffic signal poles.
- Rock drills, demolition machines, and excavators
- Other measuring instruments
- others
Cutting by rapidly rotating a diamond wire wrapped around the structure! Enables cutting in places that are difficult for people to access and allows for cutting of large cross-sections!
- Road construction
Light diffuses 360 degrees, providing excellent visibility from any angle.
- Road construction
- Road facilities
- Tunnel construction
Maximum discharge pressure of 55 bar and discharge capacity of 30 m³/h! Electric concrete pump.
- Concrete Machinery
Utilize pinpoint forecasts on-site to avoid the dangers of sudden heavy rain! Achieve weather digital transformation using ICT!
- Bridge Construction

【Examples of ZEROSAI Implementation】 NEXCO: Utilizing pinpoint forecasts at road construction sites to avoid the dangers of sudden heavy rain! Achieving weather digital transformation (DX) using ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Challenges on Site: Key Points in Evaluation [Operating Environment] - Install the [N Sensor] on site to conduct real-time observations of rain, wind, temperature, and humidity. Additionally, set up a [Web Camera] to check the construction site conditions from the site office and staff smartphones. Since there is no power supply on site, a solar power generation system will be installed. [Purpose of Implementation] - In the event of a sudden heavy rain during construction, rapid on-site response becomes difficult, so it is necessary to avoid risks such as sediment runoff and landslides in advance. - Sediment runoff can also adversely affect the quality of cut and fill, so it is essential to predict heavy rain occurrences in advance and take countermeasures. ■ Proposal (Example) For more details, please download the PDF.
Share weather information and camera footage from the mountain area of concern with all workers' smartphones and PCs! Achieving weather digital transformation (DX) using ICT!
- Other civil engineering works

【ZEROSAI Case Study】Oita Prefecture Disaster Recovery Work Sharing weather information and camera footage of a site affected by rainfall in the mountains with all workers' smartphones and PCs! Achieving weather digital transformation (DX) using ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. 【Challenges on Site】 - Due to being a hot spring town in the mountains, the weather conditions are harsher compared to urban areas, and general weather information is insufficient. - When typhoons or linear precipitation zones occur, roads become flooded, making it difficult to even reach the site. - There are also inns nearby, and it is necessary to encourage local residents to evacuate. 【Operations to Solve the Challenges】 For more details, please download the PDF.
Adopting Industry 4.0 with a real-time location information system.
- Systems Architecture
- Entrance/exit management and personal identification system
- Other commercial buildings and service facilities
This is an announcement for the rental of a fluorescent X-ray analysis device suitable for concrete salt damage investigation.
- Other civil engineering works
- Measurement and analysis equipment leasing and rental
Utilizing new features, we constantly check real-time observation values along with wind speed predictions. Achieving the digital transformation of weather and ocean conditions using ICT!
- Other civil engineering works

【Compass PLUS Implementation Case】 Ministry of Land, Infrastructure, Transport and Tourism - Airport and Port Development Bureau Caisson Installation Work Utilizing new features to predict wind speed and continuously monitor real-time observation values Achieving DX of meteorological and oceanographic data using ICT!
We will introduce a case study of the 【Compass PLUS】 (NETIS registration number QSK-210001-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Challenges on Site: Key Points of Evaluation 【Challenges on Site】 - There are no obstructions, and wind speed must be strictly managed during crane operations, necessitating the installation of caissons. - Due to crane operations, it is essential to grasp not only the predicted wind speed but also the observed values. - When the operational threshold is exceeded, information must be shared simultaneously across the entire site. 【Operations for Solving Challenges】 Please download the PDF for more details.
Even without a strength calculation report, you can at least understand the essential components needed for seismic construction! A simplified seismic construction series for interior contractors!
- Vibration isolation, vibration control, and earthquake resistance construction
- Earthquake-resistant construction method
This is a newly developed standing sign that has been processed with countless holes, making it less likely to topple in strong winds and providing excellent visibility from the rear. Custom productio...
- Road construction
- Signs, banners, lanterns, and curtains
- Other civil engineering works
Remote monitoring of on-site rainfall and camera footage via the cloud! Centralized management of typhoon and linear precipitation zone information! Achieving weather digital transformation using ICT!
- Bridge Construction

【Examples of ZEROSAI Implementation】 Regional Development Bureau - Road Improvement Project in XX Area - Disaster Recovery Work - Remote monitoring of rainfall and camera footage on-site via the cloud! Centralized management of typhoon and linear precipitation zone information! Achieving weather digital transformation using ICT!
We will introduce a case study of the natural disaster prevention system ZEROSAI (NETIS registration number QS-150021-VE). It can be utilized not only for safety measures but also for creative ideas and technical proposals. Challenges on-site: Key points for evaluation 【Operating Environment】 Install the 【N sensor】 and 【Web camera】 at the top of the slope on-site. This allows for monitoring the entire site from above. Additionally, since there is no power supply on-site, operations will be conducted using a solar power system. 【Purpose of Implementation】 - The slope is 10 meters high, and due to the unstable ground after the earthquake, monitoring rainfall is essential. - A tool for centralized management of linear precipitation band information and weather forecasts is necessary. - If it rains, going to the site itself is dangerous, so remote monitoring is required. ■ Proposal (Example) For more details, please download the PDF.
Perfect Roof: Roofing Material that Shapes Your Imagination
- Roof and gutter construction
It is a long-sized LED guidance light and signal light.
- Road construction
- Car and bicycle parking facilities
RoHS compliant! Surge Protective Device (SPD) High Performance Standard Series
- Prime movers, torque converters, hydraulic equipment, generators
We respond to various requests! Our design and site personnel will respond directly and promptly.
- Subsidiary materials
- Special Construction Method
A rich lineup is available! Product catalog for portable and emergency diesel engine generators.
- Prime movers, torque converters, hydraulic equipment, generators
The "DGW400DMC," capable of simultaneous welding for two people with a φ4mm, is among the diverse lineup we offer!
- Prime movers, torque converters, hydraulic equipment, generators
A lineup of compact and lightweight high-power welding machines such as "EGW190M-I" and "EW130"!
- Prime movers, torque converters, hydraulic equipment, generators
We have a wide range of products including welding machines, floodlights, and brush cutters!
- Prime movers, torque converters, hydraulic equipment, generators
Repair and protective coating materials suitable for water purification plants and distribution reservoirs.
- Special Construction Method
Reduce losses through a consistent system! Achieve high-quality construction while keeping prices down!
- Waterproofing work
Environmentally friendly waterproofing materials for rooftops, balconies, roofs, etc.! We offer options such as 'asphalt waterproofing'.
- Waterproofing work
Protected in harsh environments such as industrial facilities and water supply and sewage systems! A wide range of products available.
- Special Construction Method
Introducing a lineup of epoxy resin systems and vinyl ester resin systems! An introduction to anti-corrosion lining methods.
- Sewerage facilities
Water jet method used for repair and renovation work of concrete structures.
- Renovation and repair methods
The C type/D type organic acid-resistant specifications can also be used for corrosion-resistant coatings in building wastewater tank facilities (building pits)!
- Special Construction Method
For exterior wall and roof painting, please leave it to us.
- Plastering and painting work