List of Construction, work and methods products
- classification:Construction, work and methods
376~390 item / All 27690 items
Since the construction-generated soil will be recycled on-site, the disposal costs for leftover soil and the costs for new purchases will be significantly reduced. 【Disaster Prevention】
- Special Construction Method
The Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism has featured our 3D printer in the Nikkei newspaper.
The official X account of the Noto Reconstruction Office of the Ministry of Land, Infrastructure, Transport and Tourism and the Nihon Keizai Shimbun have published that our 3D printer has been adopted for the reconstruction of Noto. The official X account of the Noto Reconstruction Office introduces the use of our products in the restoration work of the Noto Expressway. Additionally, the Nihon Keizai Shimbun mentions that structures made with our products are being used for the restoration of roads damaged by the Noto Peninsula earthquake, and that the construction period can be shortened by about two weeks, so please take a look.
Contributing to the second stage of public infrastructure! Bringing public infrastructure development to the ground. A robust outdoor storage tank for hazardous materials capable of responding to the ...
- Water Treatment
Widely adopted nationwide. A temporary closure method that accommodates low headroom and narrow conditions, allowing for the planned reinforcement of public bridges.
- Renovation and repair methods
Considering the actual conditions of repair and reinforcement work. A temporary closure method that achieves stable construction even under narrow and low headroom conditions.
- Renovation and repair methods
It is possible to select shapes based on site conditions. A temporary closure method for bridge piers that is easy to consider from the design stage.
- Renovation and repair methods
Construction that takes into account the water discharge period and water level fluctuations is possible. A temporary closure method that allows for the reinforcement of bridge piers while considering...
- Renovation and repair methods
Corresponds to the reinforcement of bridge piers in marine and port areas. A temporary closure method with vibration-free construction to minimize the impact on surrounding facilities.
- Renovation and repair methods
Corresponds to reinforcement and renewal work for existing bridges. A temporary closure method that is easy to consider even in seismic reinforcement projects with many constraints.
- Renovation and repair methods
A bridge pier temporary closure method that makes it easy to organize work processes and can be easily implemented even during nighttime or within a limited construction period.
- Renovation and repair methods
A temporary closure method that is easy to implement even for bridge pier reinforcement work where heavy machinery cannot be used, accommodating manual construction.
- Renovation and repair methods
A rational design that reduces the process by controlling custom components. A temporary closure method for bridge piers that can flexibly respond even under strict headroom conditions.
- Renovation and repair methods
Balancing construction shortening and workability. A bridge pier temporary closure solution that is easy to implement even under heavy machinery restrictions and low headroom conditions.
- Renovation and repair methods
Optimize the process through material rationalization. A temporary formwork method for bridge piers that achieves both shortened construction time and reduced workload.
- Renovation and repair methods
Construction is possible with a temporary cutoff of about 1.0m for the bridge pier reinforcement work, which has many constraints.
- Renovation and repair methods
Over 90 construction achievements and more than 110 target bridge piers. A liner plate temporary closure method that accommodates low headroom and narrow conditions, contributing to shortened construc...
- Renovation and repair methods
Immediate traffic opening! Reducing social costs without excavation.
- Renovation and repair methods
Up to 10 people can talk at the same time! Smooth information sharing within the factory.
- Unit and other construction
- others