List of Civil Engineering Materials products
- classification:Civil Engineering Materials
2296~2340 item / All 10254 items
Segmented construction is possible! A new type of modular bridge that allows for rapid and easy installation.
- Foundation construction
Ceiling drop prevention! Can be added later! Covers the gap between the ceiling and the wall with a twist and snap.
- Ceiling decoration and design materials
- Joint material
- Roof and gutter construction
We offer four types: 28-inch, 32-inch, 40-inch, and 50-inch.
- Bridge Materials
For pest and odor prevention! Allowable static pressure is up to -1000Pa.
- Piping and insulation
- Piping materials (plastic pipes)
We provide anchor bars and anchor caps installed to restrict girder movement of bridge rubber bearings and to prevent bridge collapse.
- Bridge Materials
It has a hanging hole for fall prevention, so it is difficult to remove.
- Bridge Materials
It will not damage the PC steel materials.
- Bridge Materials
This is a formwork used for embedding in hollow slab bridges.
- Bridge Materials
It facilitates the movement of concrete pumping pipes on the bridge deck in cantilever construction methods.
- Bridge Materials
There are many types such as anchoring pipes and through pipes! We can accommodate various anchoring systems.
- Bridge Materials
Protects rebar from salt damage and prevents early deterioration of reinforced concrete!
- Bridge Materials
We will introduce a case where Kyoriyokker 21 was adopted due to the short construction period until the event, its constructability, and its good appearance immediately after construction.
- Other park materials
- Wall and rooftop greenery
We will introduce a case where Kyoriyokker 21 was adopted due to its high usage frequency and minimal joints, resulting in a good landscape!
- Other park materials
- Wall and rooftop greenery
Introducing the case where Kyoryokka 21 was adopted for the waterfront protection along the Koryu River flowing in front of IKEA!
- Other park materials
- Wall and rooftop greenery
We will introduce a case where a park became a gathering place for children at the prefectural office!
- Other park materials
- Wall and rooftop greenery
Greening of the mound perimeter created at the port! Introducing a construction case of Kyoryokka 21.
- Other park materials
- Wall and rooftop greenery
It is important to choose anti-stain materials according to the characteristics of the material and the intended use! Let's reduce the effort of cleaning and maintenance with anti-stain materials.
- paint
- Civil Engineering Sheet
The number of components and working hours are reduced by about half! Workability and safety are improved.
- Civil Engineering Sheet
- Scaffolding and Support Materials
Easy to install with a shape that matches the width of the side ditch, and it looks neat too!
- Secondary paving products
- Gutters and U-shaped gutters
- Road facilities
Towards a resource-circulating processing to solve the problems of the current organic waste treatment process!
- Fertilizers and Pesticides
Local production for local consumption starting with fertilizers! Supporting reduced production costs, reduced chemical fertilizers, and circular agriculture.
- Fertilizers and Pesticides
Construction in March 2018 (Heisei 30). An example of installing grass protection materials simultaneously with grass installation around the playground equipment.
- Other park materials
Case study of rockfall prevention and mitigation works in a 250m2 area of rock and gravel soil!
- Rockfall prevention agent
A method of preventing falling rocks within a wire mesh by securing floating stones and rolling stones with wire mesh and wire ropes!
- Rockfall prevention agent
Suppressing the movement and loss of soil microparticles on slopes due to rainfall and frost heave! A case where a method without greening was adopted.
- Slope protection material
Integration of waterproof sheets with weather resistance and diamond mesh! Case study of diamond mesh combined with erosion prevention.
- Slope protection material
Examples of rockfall countermeasures and preventive works in a 200m² area with soil consisting of rock masses and gravel!
- Rockfall prevention agent
The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!
- Rockfall prevention agent
The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!
- Rockfall prevention agent
A case where the vegetation sheet (environmental product) was changed for improved embankment (approximately pH 9.8)!
- Slope protection material
Construction on cement-improved embankment with unknown pH! Quantity is 1,000m2, soil type is sandy soil.
- Slope protection material
Order for the prefectural rural disaster prevention and mitigation project! Quantity is 1,300m2, soil type is clayey soil.
- Slope protection material
A wire rope net is installed tightly against the slope! It suppresses the initial movement of loose stones and floating rocks, preventing them from becoming falling rocks.
- Rockfall prevention agent
A case that tracked the period from before construction, upon completion, and after 2 months, 3 years and 3 months, 5 years and 5 months, and 7 years and 5 months!
- Slope protection material
Construction within a national park in Ehime Prefecture! The area is 300m2, and the soil type is gravelly soil.
- Slope protection material
An example of a construction method that secures a root growth layer and prevents compaction due to foot traffic!
- Other park materials
Case from December 2019 (R1)! Implemented using a construction method that secures the root growth layer.
- Other park materials
A structure that ensures the growth layer of roots, preventing compaction due to foot traffic! An example of being used as a parking lot.
- Other park materials
The Waterway Department uses Ryokkasuiri! Here are examples of its application for soil conservation in sandy soils.
- Slope protection material
It is possible to minimize the felling of standing trees on slopes! A case using colored materials.
- Rockfall prevention agent
Mixed jade and stone soil, construction for 500m2! A case study followed up 6 months after construction.
- Slope protection material
Order for disaster-resistant road construction project! Example of change from legal framework work.
- Slope protection material
Application for rockfall countermeasures and prevention, case from October 2022 (R4), quantity 3,500 m².
- Rockfall prevention agent
Case from June 2021 (R3)! Implemented using a method that combines rope laying work with a thick wire mesh.
- Rockfall prevention agent