"Drone Infrared Survey" Regular inspections of commercial facilities. An example of minimizing the impact on operations by completing the survey in one day.
"Drone infrared survey" The investigation of office buildings raised concerns about pedestrian traffic, but the survey was completed in a short time during the weekend when foot traffic was low.
"Drone infrared inspection" is a method that enables inspections to be conducted quickly, safely, and at a reduced cost. This is an example of a survey conducted for prioritizing repairs.
Visualize the salt content and accurately grasp the deterioration progress of structures that can be utilized in longevity planning.
The "DNT Coating Diagnosis System" is an innovative comprehensive coating diagnosis system that selects the optimal repainting specifications!
Housing Performance Indication System Grade Assessment System Homes-kun "Performance Check Sheet"
To check for daily fluctuations, automatic measurements will be conducted for about one week before and one week after the static load test!
Low cost, high precision, accurate non-destructive testing from 50,000 yen per specimen.
Introduction of drone inspection for the cyclone inside the new suspension preheater! [Tokuyama Corporation]
Expanding the range of inspection solutions! Widely utilizing "IBIS" for waste treatment facilities, earthquake-damaged buildings, and more [Tokyo Soil Research Co., Ltd.].
Patent obtained! Unmanned inspection and diagnosis system for pressure-free waterway tunnels during water flow.
Introduction of overseas research examples on the deterioration suppression effects of silane-based and silicate-based impregnants.
- High precision and rapid verification of processing accuracy on the line! Improved efficiency by reducing travel time. - High-precision observation and measurement with a portable microscope.
A must-see for those who want to know the current seismic resistance without incurring large costs!
Essential evaluations for pre-construction surveys, seismic design, and maintenance management of rock structure facilities.
[Budget Reduction] Introducing a case where it was decided to implement seismic isolation instead of new construction, confirming a useful life of 50 years in the future.




































































































































