Achieving high-strength wall substrates from 8m to 10m! Only interior construction contractors will carry out the work, from the substrate to the board installation!
It expresses a unique texture with a deep aging-style finish. [Responsible construction]
A construction method that allows for pipe branching, valve replacement, and expansion work with minimal water drainage! We have newly started a warranty system for the "freezing method"!
Yoshino Fireproof Column ZC-1 ZC-2 ZC-3 Fireproof Coating Method for Steel Columns (H-shaped Steel) Using Reinforced Gypsum Board
Protects the anti-corrosion layer over the long term and maintains corrosion resistance! Reduces human and environmental impact.
A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.
Comprehensive disaster prevention product for cable and metal pipe wall and floor penetrations, recognized worldwide.
Quickly solve the issues of conventional construction methods! Door frame installation is possible after the wall surface is finished.
This is a construction method suitable for temporary closures associated with the reinforcement of movable weirs that can adjust water levels and flow rates!
A new proposal for drain pipe maintenance that prevents the growth of bacteria in the drainage pipes through antibacterial processing, helping to avoid issues such as clogs and odors! Installation in as little as one day.
Repair the joint with the floor using "UD200SR" and construct the vertical section with "Eucolite RG"!















































































































































