
It expresses a unique texture with a deep aging-style finish. [Responsible construction]

Introducing repair and reinforcement methods for concrete structures using carbon fiber sheets and aramid fiber sheets!

Highly reliable waterproofing! It is an environmentally friendly low-impact waterproofing method.

Improving economic efficiency in small bridges under 20 meters.

By utilizing the power of nitrite and lithium ions, a rust prevention environment is established for reinforced concrete structures that have deteriorated due to neutralization and salt damage, contributing to the longevity of the structures.

Introducing the construction method of the Tōsui CON filling technique by ESP Co., Ltd.!

A scaffolding temporary construction method using detachable fittings that can easily remove powerful magnets!
Galvanizing separation construction and galvanizing welding parts are possible! A room temperature zinc plating method that protects steel frames from rust, regardless of member shape or plate thickness!

For bridge and road repair work! 3D shape management system "Hatsuly" for chipping depth and mortar quantity cross-section restoration!

Ideal for asbestos removal! Equipped with a standard HEPA filter, this is a rental of the Husqvarna cyclone dust collector.

Correct the floor tilt caused by earthquakes or ground subsidence without stopping operations and in a short time! No need to move machines or equipment! Also suppress any concerning vibrations from the machines!

Quickly restore road unevenness and depressions during an earthquake with polyurethane resin, enabling swift vehicle passage. Contributing to the establishment of emergency transportation routes!

A gap or cavity of approximately 200mm at most occurred! A case where it was resolved in one day using the up-con method.

No sound, no smell, no dust.

Highly reliable waterproofing! It is an environmentally friendly waterproofing method with low environmental impact.
With just one switch, you can easily correct the bending and warping of the steel plate! It can be operated safely and easily by anyone, eliminating the need to hire a professional service.

Smooth renovation of facilities for the entire apartment complex! No need for temporary evacuation for first-floor residents, with a significant reduction in noise and dust due to the new construction method.

Thorough de-bubbling by visual inspection is possible! Achieving high quality with short delivery times.