[Nigata Prefecture Agency] Standard construction distance of 100-150m/day! Due to the impact method using a breaker, it can handle hard ground!
21st Century Agricultural Revolution! Shiitake Mushroom Cultivation Under Solar Panels! Fujitakemushroom Co., Ltd. × Sanki Construction Co., Ltd. Collaboration Between Different Industries!
Piping and wiring underground installation system (non-excavation and thrust method)! Numerous achievements! Also gaining attention for "overhead line removal"! "Challenging the creation of lifelines that traverse the Earth and underground."
Optimal for the field! A case where excavation for waterway widening was adopted in the infrastructure development project.
Perfectly suited for the retention basin located in a residential area! A case where dredging was adopted for a retention basin with a narrow construction range.
Constructing in underground spaces to disperse and store rainwater - Plamax MA-1 System
A maintenance walkway is incorporated inside the trough, allowing for thorough maintenance by workers! Simple assembly of components enables installation by regular workers!































































































































