
Overwhelmingly fast construction! Reconstructing and extending the lifespan of concrete corrosion caused by hydrogen sulfide and aging manholes using FRP rehabilitation materials that allow for adjustable wall thickness.

Rehabilitation of all types of pipes, such as circular, rectangular, and horseshoe-shaped, as a strong composite pipe integrated with existing pipes and rehabilitation pipe backfill material, while maintaining non-excavation and water flow!

It is possible to conduct a preliminary investigation using a self-propelled camera video to assess cracks, damaged areas, and defective sections of the installation pipes that have occurred within the sewer pipeline when making decisions about construction feasibility and method selection.

A suitable bottom plate length can be selected for various design conditions such as gravelly soil, sandy soil, and clayey soil, and it can also accommodate other special conditions!

Systematization from excavation to soil removal and solidification treatment! Construction is possible from clay to boulder layers and hard soil!

Groundwater treatment without the use of chemicals! Achieving high efficiency in groundwater utilization with a unique cleaning system!

We will assist you with rainwater runoff control measures through the creation of drawings for rainwater retention and infiltration facilities, rainwater calculations, and document preparation!

Piping and wiring burial system! Avoid obstacles with vertical and horizontal curves! Reduce total costs! "Challenging the creation of lifelines that run through the Earth and underground!"

By using a specially developed machine to cut shallow grooves into the construction diameter, we eliminate the occurrence of shear marks and steps. Steps not only cause traffic disruptions but also contribute to noise.

This is a technology for remotely operating a compact, snake-shaped specialized machine that does not require a cutter vehicle for drilling. It allows for high finishing accuracy and enables easy work in a short time.

Catalog available! This is a construction method that can be implemented even in high humidity environments where construction has been difficult. We are also recruiting new association members.

Construction case of the west Nippori trunk inflow channel connecting the pump building.

<Free Giveaway> Latest booklet packed with know-how on PCB waste disposal! Currently, we are also giving away a comfortable environment creation checklist!