
Introducing the construction method of the Tōsui CON filling technique by ESP Co., Ltd.!

The columns are delivered to the site pre-assembled at the factory, so assembly is easy.

Construction is possible even while the equipment is in operation! Safe dredging can be performed remotely from land.

The unique shape is effective for upstream migration! The terraced fishway has solved the issues faced by conventional fishways!

[Case Study] Improving upstream efficiency with a unique design! The terraced fishway solves the issues of conventional fishways.

We have a wide variety of water-blocking sheets and greening materials available! We will also introduce examples of restoration work for river breach areas.

Ideal for temporary materials for electrical work along railway lines! Passed the 75,000-volt dielectric strength test!