Utilizing weather forecast data as materials in meetings also contributes to the skill retention of less experienced staff.
Safer construction is possible with the Tome Road Improvement Project! It is a method that has low running costs and high effectiveness.
Modular reinforced plastic concrete formwork enabling high productivity of 104 m2/day/person.
For bridge and road repair work! 3D shape management system "Hatsuly" for chipping depth and mortar quantity cross-section restoration!
It also leads to the shortening of the project! We handle all the materials necessary for reinforced concrete subgrade.
[Lease] Contributes significantly to reducing construction time for formwork work with its lightweight and non-separable design!
"Can accommodate penetration hole diameters exceeding 1/2 the height of the beam" Achieved a "thinner" fireproof coating thickness for steel beam penetration holes!! (1-3 hours fire resistance: thickness 12mm)
Easy-to-work reinforced resin concrete formwork for prism-shaped structures.
Kanto Day-Bars Steel Co., Ltd. primarily engages in brokerage services related to the sale of rebar and associated processed products, as well as ancillary goods.
The lineup includes the grout-free joint "EG Series" and the "Screw Acon," which can also accommodate high-strength rebar!
To complete the painting of the two projects in one day, it is possible to reduce the number of power outage days and the number of grounding installations! Due to its weak solvent system, it is difficult to soak the existing paint film, making it suitable for repainting.























































































































