Lightweight materials that can be used in combination with on-site generated soil!
It performs volume calculations using a TIN model (triangular network) for 3D data up to 2 million in an instant.
Achieves both drainage and breathability, supporting plant growth.
Tackling the challenges of soil and waste! Proper treatment and utilization of contaminated soil and waste.
Free collection of case studies on charcoal water purification systems for reducing and removing odors!
This is a case of bridge maintenance work (tentative name) for the Hiro Second Bridge and the left bank approach road in Kure City, Hiroshima Prefecture.
Construction case study of the Hotel Okura Frontier Hotel Tsukuba Annex Square.
Naha City Kura Elementary School - Case Study of Greenery Project with Super Soil Water Storage Function
Case study of purification of dairy wastewater using a subsurface flow constructed wetland with reed beds at a private K farm.
This is a case study of the installation of a deodorization tank at a pig farm in Shobara City, Hiroshima Prefecture.
This is a case study of the installation of a deodorization tank for a chicken manure storage area in Sera Town, Hiroshima Prefecture.
This is a case study of the renovation work on the grounds of Jonan Junior High School in Kurume City, Fukuoka Prefecture.
This is a case study of soil improvement work in the H22 Ageo Road planting project in Saitama City, Saitama Prefecture.
This is a case study of the construction of a protective net facility at Front Town Saginuma.
This is a case study of the renovation work on the fountain area at the west exit square of Shinjuku Station.
This is a case of the construction work for the left bank plaza of the Muromi Dam in Uda City, Nara Prefecture.
This is a case of road repair work for the Heisei 21 fiscal year repair bond No. 6 in Hita City, Oita Prefecture.
This is a case study of the Miyazaki No. 10 Hiratsuka-Nakahara area improvement project in Miyakonojo City, Miyazaki Prefecture.
This is a case of road construction for management purposes in the Hirasawa area of Nikko City, Tochigi Prefecture.
This is a case of the Inari River construction road widening project in Nikko City, Tochigi Prefecture.
This is a construction case study for the pedestrian bridge development at Nago Castle Park's babbling brook square.
This is a case of the Nago Fishing Port 4.5m quay improvement project in Nago City, Okinawa Prefecture.
Recycled materials are increasingly being used in civil engineering, greening, agriculture, and water purification, among other applications.
Inorganic soil amendments that improve drainage and create breathable soil.

























































![道路法面散布二次製品養生[89].jpg](https://image.www.ipros.com/public/product/image/e59/2000422551/IPROS827857778111145379.jpg?w=280&h=280)











































