
Purload method (temporary road and rental associated with bridge construction ordered by the Ministry of Land, Infrastructure, Transport and Tourism)
旭洋設備工業 本社
Sekisui's 'Pura Road' realizes rapid temporary road construction.
12

Lightweight embankment: Lightweight glass foam material mixed with site-generated soil!
三陽陸運 リサイクル事業所
Lightweight materials that can be used in combination with on-site generated soil!
12

Lightweight Embankment / Soil Improvement Lightweight Glass Foam Material Delivery Record List
三陽陸運 リサイクル事業所
Incredible lightness! Ideal for civil engineering, architecture, and landscaping. This is a list of delivery records for lightweight glass foam materials.
12

Lightweight fill: Lightweight glass foam material S2 mixed with on-site generated soil for structural protection.
三陽陸運 リサイクル事業所
Construction Case: Tamagawa River Upper Stream Water Regeneration Center Seismic Reinforcement Work. Mixing with on-site generated soil to reduce the load on underground structures! 9,176m3 of lightweight glass foam material used!