Order from the Hata Civil Engineering Office in Kochi Prefecture! Case study on rockfall countermeasures and prevention.

The soil consists of gravelly soil, rock blocks, and pebbles, with examples of rockfall countermeasures and preventive works within an area of 850m2!

Case study of rockfall prevention and mitigation works in a 250m2 area of rock and gravel soil!

The soil type is clayey soil, rock masses, and pebbles, with examples of restoration work in a 250m² area!

The soil type is gravelly soil, and it is an example of rockfall countermeasures and preventive construction within a range of 1,500 m²!

Examples of rockfall countermeasures and preventive works in a 200m² area with soil consisting of rock masses and gravel!

No need for concrete foundations; installation can be done on-site! Example from February 2013.

Case study using Ribmat Green R-20! Conducted in October 2019 (R1).

Application for rockfall countermeasures and prevention, case from October 2022 (R4), quantity 3,500 m².

No need for large machinery! Examples of construction methods that do not require large or specialized machinery.

A wire rope net is installed tightly against the slope! It suppresses the initial movement of loose stones and floating rocks, preventing them from becoming falling rocks.

Introduction of the site investigation records for the construction results of rockfall prevention works that bond rockfall sources.