A rainwater system for storage, infiltration, and recharge facilities that excels in load-bearing performance and can be installed in industrial and commercial areas with heavy vehicle traffic.
Floating prevention function due to liquefaction [equipped with Sand Magic]! Small transport and delivery possible with a 2-ton truck! Suitable for areas with abundant spring water!
Visible safety measures! Effectively utilize difficult-to-bury locations, idle land, and vacant lots! Reduced total construction costs! Cost reduction compared to underground burial! Shortened construction period!
A groundbreaking renovation method that installs a steel fire water tank "inside" an existing fire water tank! Special feature article data distributed in the specialized magazine "Monthly Firefighting"!
In emergencies, set up quickly with simple operations. Quickly shut out flooding!
The difference from the vegetation sheet (perimeter) is clear due to the technology that ensures effective weed control (weed countermeasures) and the growth of grass that does not grow tall. *Test construction
Buried water storage facilities that can be installed underground in buildings or beneath busy road surfaces.
A rainwater system for storage, infiltration, and recharge facilities, created through simple connections and stacking on-site.
Optimal shape for installation under the road! Suitable for shield tunneling method and installation in narrow spaces!
【Experimental video using the model is now available!】 Easy transportation and installation due to lightweight design! Experimental footage of a seismic-resistant, fireproof water storage tank with a floating prevention feature due to liquefaction!
Recommended when additional fire-fighting water is needed due to factory expansion! Installable without excavation and in a short period! Can be installed with minimal impact on operating factories.
This is a fire water tank that can be installed without excavation in areas where the water level is high, the bedrock is hard, or where excavation space cannot be obtained!
Easy assembly and installation/removal! Capable of handling a maximum water level of 5m.
We can propose materials tailored to site conditions for the upstream and downstream of the embankment, as well as for cement-improved soil! We are currently offering our collection of greening case studies.
Design changes from Harashiba Factory based on requests from local residents! Reducing the troubles of annual grass cutting.



















































































































