Commercial facility reconstruction | Early soil investigation to prevent construction delays | Geotech
Soil contamination survey
Eliminating ground risks in advance during the renovation and rebuilding of commercial facilities. Soil measures to ensure smooth tenant attraction.
To those planning the reconstruction or large-scale renovation of commercial facilities: The key to preventing negative legacies and delays in construction is proactive early soil condition surveys. Deterioration of piping and aging infrastructure due to years of operation increase the risk of underground leakage of chemicals. Conduct a legacy risk inventory to scrutinize the history of hazardous substance handling during operations and implement reliable leakage prevention measures. This document specifically explains the practical procedures for conducting early soil condition surveys that should be carried out at a clear stage before construction work begins. Utilizing the advanced sampling and latest analytical expertise of Geotech, an investigation agency designated by the Ministry of the Environment, we visualize the ground contamination status as objective evidence without halting facility operations. We present an approach to expedite administrative consultations and development permit applications. 【Usage Scenarios】 - When planning the reconstruction or renovation of commercial facilities - Environmental risk assessment before tenant attraction - Expediting development permit applications - Avoiding future soil contamination issues 【Benefits of Implementation】 - Reduction of construction delay risks - Mitigation of unexpected additional costs
Inquire About This Product
basic information
【Features】 - Investigations conducted by designated survey organizations in compliance with the Soil Contamination Countermeasures Act and Ministry of the Environment guidelines - Comprehensive support from Phase 1 (historical investigation) to Phase 2 (overview investigation) - Use of low-noise, low-vibration small drilling equipment that can operate safely even in narrow spaces - Sampling that does not affect the operation of production lines - Strict analysis using official methods by certified measurement facilities and highly reliable data reporting 【Our Strengths】 At Geotech, we provide a one-stop service for all tasks related to "ground," including ground investigations and reinforcement design/construction for new buildings, subsidence correction work for existing buildings, soil contamination investigations, and ground information services. With extensive experience and proven technology, we create the future of cities from the ground up.
Price information
-
Price range
P3
Delivery Time
P4
Applications/Examples of results
This is ideal for preventing risks of construction delays and unexpected costs when replacing buildings, expanding or modifying production lines, and renovating underground piping in factories or facilities that handle chemical substances. By proactively conducting a legacy risk inventory from the pre-construction phase and introducing early soil condition surveys as underground inspections to prevent chemical leaks, the processes for development permits and administrative consultations can be significantly expedited. It serves as a practical evidence-building tool to objectively confirm the safety of the ground while maintaining operational continuity, thereby controlling the overall contractual risks and liability for defects of the project.
catalog(3)
Download All Catalogs
Company information
-



![[For the Construction Industry] Development Permit Support for Cleaning Land Contamination Risk Mitigation](https://image.www.ipros.com/public/product/image/321794/IPROS560077723580943143.png?w=280&h=280)


![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)