Designated Investigation Agency | Soil Contamination Survey Before Demolition and Modification
Soil contamination consulting
Evaluate dismantling risks in advance to prevent delays in construction and cost increases.
As a designated investigation agency by the Ministry of the Environment, we conduct soil contamination and historical site investigations (Phase 1) prior to building demolition and land alteration. We identify contamination risks early based on past operational history, thereby avoiding construction delays and additional costs. Geotech provides comprehensive support starting from the "Historical Site Investigation (Phase 1)," which is a retrospective analysis of facility layout, to the "Soil Overview Investigation (Phase 2)" tailored to the level of risk, and the "Detailed Investigation (Phase 3)" for identifying the extent of contamination. With our own environmental sampling equipment capable of operating in narrow spaces and indoors, we ensure reliable "sample collection" and "analysis of surplus soil" from construction. We promptly prepare and issue an "Environmental Investigation Report under the name of the designated investigation agency" for submission to authorities, ensuring compliance with laws and stabilizing project management. 【Benefits of Implementation】 - Visualization of risks at the planning stage - Prevention of construction delays due to unexpected contamination - Cost reduction through appropriate measures - Reliable fulfillment of legal obligations
Inquire About This Product
basic information
【Features】 - Development of investigation plans tailored to the purpose from Phase 1 (historical investigation) to Phase 3 (detailed investigation) - Highly reliable investigations and evaluations conducted by investigation agencies designated by the Ministry of the Environment (or prefectures) - Comprehensive services from the proposal of remediation measures in the event of soil contamination to construction and management - Investigation support in narrow spaces and indoors using the compact boring machine "SCSC" - Accurate risk assessment and cost-effective planning by specialized technicians 【Our Strengths】 Geotech, as a designated investigation agency by the Ministry of the Environment, provides one-stop services from the historical investigation (Phase 1) required before demolition work to reliable soil gas and soil sample collection (sampling) and hazardous substance assessment tests. With extensive experience and proven technology, we support our clients in solving their challenges.
Price information
Please consult us as it depends on the details of the investigation.
Price range
P3
Delivery Time
P4
Applications/Examples of results
* Conducting an analysis of past land use history (Phase 1 of historical investigation) and environmental risk assessment related to pre-modifications before the demolition of structures or before handing over the cleared land. * Ensuring reliable soil gas and soil sample collection (sampling) at the demolition site, as well as hazardous substance determination tests, in full compliance with the Soil Contamination Countermeasures Act and the environmental regulations of each municipality. * Conducting environmental hazardous substance determination tests on construction-generated soil (excess soil) that is transported off-site due to demolition and construction work, and preparing environmental investigation reports under the name of a designated investigation agency.
catalog(2)
Download All CatalogsCompany information
-






![Dry Wave Retractable Indoor Clothes Drying Rack [Good Design Award Winner]](https://image.www.ipros.com/public/product/image/600/2000331235/IPROS31366560678415915313.jpeg?w=280&h=280)

![[Proposal] Bird Damage Prevention (Wire Type) Altima Bird Prevention Wire](https://image.www.ipros.com/public/product/image/2032865/IPROS2629637137718331190.jpg?w=280&h=280)